background image

Operating Information

2- 8

TLA600 Series Logic Analyzer Service Manual

7.

Follow the on-screen instructions to install the software on the hard disk.

8.

After the installation is complete, go back to the TLA Performance
Verification folder on the CD.

This completes the software installation procedure.

Use the following procedure to remove the performance verification and
adjustment software from the instrument. These steps are necessary when you
want to upgrade the PV software.

1.

Open Windows Explorer and then locate and select the C:\Tekcats folder.

2.

Go to the File menu and select Delete to delete the folder.

3.

Repeat steps 1 and 2 to delete the Temptek folder if it exists.

4.

Select Start

Settings

Taskbar & Start Menu.

5.

Click the Advanced tab followed by the Advanced button.

6.

Open the following directory path under Documents and Settings:

All Users

Start Menu

Programs

7.

Locate and delete the TLA Performance Verification item.

Removing the Software

Содержание TLA600 Series

Страница 1: ...uy your excess underutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing R...

Страница 2: ...0728 01 Warning The servicing instructions are for use by qualified personnel only To avoid personal injury do not perform any servicing unless you are qualified to do so Refer to all safety summarie...

Страница 3: ...and foreign patents issued and pending Information in this publication supercedes that in all previously published material Specifications and price change privileges reserved Tektronix Inc P O Box 50...

Страница 4: ...locations This warranty shall not apply to any defect failure or damage caused by improper use or improper or inadequate maintenance and care Tektronix shall not be obligated to furnish service under...

Страница 5: ......

Страница 6: ...iption 2 1 User Interface 2 2 Operating System and Application Interface 2 6 Online Help 2 6 Software Installation and Removal 2 6 Theory of Operation Hardware 3 1 Probe Interface 3 2 Acquisition 3 3...

Страница 7: ...ing the Trim and Covers 6 7 Adding Memory 6 12 Removing the Display 6 13 Display Adapter Board 6 14 Standby On Switch Flex Circuit Removal 6 15 Removing the Closed Face Bracket TLA 60X Series 6 17 Fro...

Страница 8: ...nual iii Options Probe Options 7 1 Electrical Parts List Diagrams Hardware Architechure Block Diagram 9 1 Interconnection Block Diagram 9 2 System Block Diagram 9 3 Mechanical Parts List Parts Orderin...

Страница 9: ...erification fixture detail 4 23 Figure 4 10 Probe tip adapter detail 4 26 Figure 4 11 Adjustment verification fixture detail 4 28 Figure 5 1 P6434 probe detail 5 3 Figure 5 2 Initial deskew test setup...

Страница 10: ...0 Power supply mounting screw location 6 38 Figure 6 21 Replacing the fan assembly 6 40 Figure 9 1 Logic analyzer hardware architecture 9 1 Figure 9 2 Logic analyzer interconnection block diagram 9 2...

Страница 11: ...TLA600 cooling 1 12 Table 1 15 TLA600 mechanical characteristics 1 13 Table 1 16 Atmospheric characteristics 1 14 Table 1 17 Certifications and compliances 1 14 Table 1 18 Adjustment verification fix...

Страница 12: ...e 6 1 Tools required for module removal 6 6 Table 6 2 Failure symptoms and possible causes 6 42 Table 6 3 TLA 700 Power on diagnostic tests 6 44 Table 6 4 BIOS error codes and explanations 6 45 Table...

Страница 13: ...Table of Contents viii TLA600 Series Logic Analyzer Service Manual...

Страница 14: ...through the grounding conductor of the power cord To avoid electric shock the grounding conductor must be connected to earth ground Before making connections to the input or output terminals of the pr...

Страница 15: ...ppear on the product DANGER indicates an injury hazard immediately accessible as you read the marking WARNING indicates an injury hazard not immediately accessible as you read the marking CAUTION indi...

Страница 16: ...s product unless another person capable of rendering first aid and resuscitation is present Disconnect Power To avoid electric shock switch off the instrument power then disconnect the power cord from...

Страница 17: ...Service Safety Summary xii TLA600 Series Logic Analyzer Service Manual...

Страница 18: ...oductions to all procedures These introductions provide important information needed to do the service correctly safely and efficiently Manual Conventions This manual uses certain conventions that you...

Страница 19: ...ales support 1 800 833 9200 select option 1 Service support 1 800 833 9200 select option 2 Technical support Email techsupport tektronix com 1 800 833 9200 select option 3 1 503 627 2400 6 00 a m 5 00...

Страница 20: ...ng To prevent personal injury or damage to the logic analyzer consider the following requirements before attempting service H Read the General Safety Summary and Service Safety Summary found at the be...

Страница 21: ...shown in figure Figure i Figure i TLA600 Series logic analyzers The TLA600 series is comprised of 12 logic analyzers as listed in Table i Table i TLA600 series family Logic analyzer Description TLA601...

Страница 22: ...nel 2 GHz timing 100 MHz state 1 M depth Internal and external display Adjustment and Certification Interval Generally you should perform the adjustments and certification calibration described in the...

Страница 23: ...rements for calibration and or repair of your logic analyzer Service Options Tektronix Service Options can be selected at the time you purchase your instrument You select these options to provide the...

Страница 24: ...er must be in an environment with temperature altitude humidity and vibration within the operating limits described in these specifications H The logic analyzer must have had a warm up period of at le...

Страница 25: ...ignal swing minimum required beyond threshold whichever is greater 4 V maximum beyond threshold Maximum nondestructive input signal to probe 15 V Minimum input pulse width signal single channel Typica...

Страница 26: ...Signals 1 and 2 ECLTRG0 1 are limited to a broadcast mode of operation where only one source is allowed to drive the signal node at any one time That single source may be utilized to drive any combin...

Страница 27: ...s Source Selection Signal 1 2 3 4 or 10 MHz clock Output Modes Level Sensitive User definable Active true low or active true high Output Levels VOH VOL 50 Ohm back terminated TTL output 4 V into open...

Страница 28: ...13 TLA614 64 K or 256 K samples1 TLA621 TLA622 TLA623 TLA624 1 M samples 1 PowerFlex options Table 1 5 TLA600 clocking Characteristic Description Asynchronous clocking n Internal sampling period1 4 ns...

Страница 29: ...ns steps setup time Hold time follows the setup time by the setup and hold window size n Maximum synchronous clock rate4 200 MHz in full speed mode 5 ns minimum between active clock edges 100 MHz 10...

Страница 30: ...dth double bounded range recognizers The following selections are available 16 word recognizers 0 range recognizers 13 word recognizers 1 range recognizer 10 word recognizers 2 range recognizers 7 wor...

Страница 31: ...data samples received 250 MHz maximum Trigger machine actions Main acquisition trigger Triggers the main acquisition memory Main trigger position Trigger position is programmable to any data sample 4...

Страница 32: ...litch violation storage The acquisition memory can be enabled to store glitch violation information with each data sample when asynchronous clocking is used The probe data storage size is reduced by o...

Страница 33: ...MB loaded in one socket Maximum 512 MB with both sockets loaded Real Time Clock and CMOS Setups Plug Play NVRAM Retention Time Battery life is typically 3 years when the logic analyzer is not connect...

Страница 34: ...x 480 256 640 x 480 64 000 640 x 480 16 800 000 800 x 600 256 800 x 600 64 000 800 x 600 16 800 000 1024 x 768 256 1280 x 1024 256 Internal Display Classification Thin Film Transistor TFT 10 4 inch ac...

Страница 35: ...tinuous range CAT II Fuse Rating 90 V 250 V Operation 2 required UL198 CSA C22 2 0 25 in 1 25 in Fast Blow 8 A 250 V Tektronix part number 159 0046 00 Bussman part number ABC 8 Littlefuse part number...

Страница 36: ...dimensions Weight Includes empty accessory pouch and front cover TLA614 TLA624 TLA613 and TLA623 18 1 Kg 40 lbs TLA612 TLA622 TLA611 and TLA621 18 Kg 39 75 lbs TLA604 and TLA603 17 6 Kg 38 75 lbs TLA6...

Страница 37: ...tifications and compliances Category Standards or description EC Declaration of Conformity EMC Meets intent of Directive 89 336 EEC for Electromagnetic Compatibility Compliance was demonstrated to the...

Страница 38: ...ribution level mains usually permanently connected Equipment at this level is typically in a fixed industrial location CAT II Local level mains wall sockets Equipment at this level includes appliances...

Страница 39: ...l typical 2 V referenced to ground GND VDD switcher noise typical 50 mVp p measured at C17 n Internal clock frequency 50 065 MHz 0 01 Output electrical characteristics Data clock output amplitude 10K...

Страница 40: ...help for more information on how to use your logic analyzer TLA600 Series Logic Analyzer Description The TLA600 series is a high performance line of logic analyzers There are two basic styles one sty...

Страница 41: ...provide scrolling of logic analyzer displays There is one USB universal serial bus port The USB port can be used for any USB complaint device Table 2 1 lists the pin assignments of the USB connec tor...

Страница 42: ...ws SYSTEM TRIG IN Connector The System Trigger Input is a TTL compatible signal input that is user definable in software The System Trigger Input utilizes a BNC connector Refer to your user manual for...

Страница 43: ...ignments Table 2 2 SVGA OUT pin assignments Pin number Pin function Pin number Pin function 1 RED 2 GRN 3 BLU 4 NC 5 GND 6 GND 7 GND 8 GND 9 KEY 10 GND 11 NC 12 DDC DAT 13 HSYNC 14 VSYNC 15 DDD CLK Th...

Страница 44: ...s compliant connector See Table 2 4 for pin assignments Table 2 4 LPT parallel interface pin assignments Pin number Pin function Pin number Pin function 1 BUSY 19 GND 2 SLCT 20 GND 3 ACK 21 GND 4 ERR...

Страница 45: ...ontrols data acquisition and processing by the logic analyzer The TLA series application software is included with the product You can also install other Windows based software as needed to work with...

Страница 46: ...Tekcats or Temptek on the hard drive the software installation cannot be completed Follow these instruc tions to verify the directory is not present 1 Select Start Search For Files or Folders 2 In th...

Страница 47: ...ment software from the instrument These steps are necessary when you want to upgrade the PV software 1 Open Windows Explorer and then locate and select the C Tekcats folder 2 Go to the File menu and s...

Страница 48: ...to the interface board The mother board communicates with the interface board through the PCI bus and the USB bus The Riser board connects the NLX mother board to the interface board It also has the...

Страница 49: ...xtend its life and prevent the burning of the screen The color LCD is supported by an external DC switching regulator board to provide the back light high voltage and a display adaptor board which con...

Страница 50: ...cquired by the probes determines when to clock the data into memory and communicates the acquisition information with the rest of the instrument The acquisition board also contains the LPU circuitry w...

Страница 51: ...Theory of Operation 3 4 TLA600 Series Logic Analyzer Service Manual...

Страница 52: ...certification data For those cases you can make copies of the calibration data report included with this manual and then fill out the reports with the data that you obtain from the procedures Perform...

Страница 53: ...t up test equipment Select procedure Allow instrument and equipment to warm up 30 minutes Are all certifications complete Done Is it OK with customer to remove reconnect probes from System Under Test...

Страница 54: ...ired with one inch ground leads Tektronix P6243 or P6245 probe with accesso ries 5 1X probe One required with one inch ground leads Tektronix P6101B probe with accessories 6 Logic analyzer probes Two...

Страница 55: ...ic Analyzer Mainframe diagnostics No Logic Analyzer CheckIt Utilities No P6417 P6418 or P6434 logic analyzer probes Signal Input check Yes NOTE Running the extended diagnostics will invalidate any acq...

Страница 56: ...tion to start 2 Go to the System menu and select Calibration and Diagnostics 3 Verify that all power on diagnostics pass 4 Click the Extended Diagnostics tab 5 Select All Modules All Tests top line an...

Страница 57: ...ify the operation of the PC hardware in the instrument You can test most of the hardware in the instrument using selected tests with CheckIt Utilities You don t need to run all of the tests since Chec...

Страница 58: ...Group J3 Clock channel J5 Figure 4 2 Probe functional verification test setup Perform the following steps to complete the probe functional verification procedure 1 Ensure that the jumper at J15 on the...

Страница 59: ...activity on all probe channels connected to the test fixture Figure 4 3 shows an example of the Activity Monitor Note the signal activity for clock CK3 and data channels for the C3 7 0 and C2 7 0 grou...

Страница 60: ...e once a year You will use the performance verification and adjustment software to complete most of the performance verification procedures You will check the accuracy of the 10 MHz system clock manua...

Страница 61: ...in a temporary file and are available upon test completion for completing test records for certification To obtain partial test information you can also run individual tests or selected groups NOTE T...

Страница 62: ...2 3 All tests Trigger state sequence rate 4 All tests and Extended Diagnostics Internal sampling period3 1 When the setup and hold time tests are both performed the setup and hold window size is indi...

Страница 63: ...6XX PV 5 Follow the instructions on the screen to enter the name you want to appear in the User Name field as shown below This name will appear on the Calibration Data Reports 6 The program lists seve...

Страница 64: ...f the full sequence The sequence runs from the selected starting point to the end of the sequence H SELECT TEST S runs only the selected tests To run a single test enter the test number To run multipl...

Страница 65: ...logic analyzer and follow the on screen instructions to print the test results If a printer is not available you can view the test results directly from the screen or you can copy the test results to...

Страница 66: ...xternal Signal Out TTL BNC connector on the back of the instrument 2 Verify that the Tektronix Logic Analyzer application is running 3 Go to the System window and select System Configuration from the...

Страница 67: ...correct polarity GND to GND pin 1 to pin 1 J20 J6 J7 J1 J2 J3 J16 J13 J4 J11 J17 J19 J9 J18 J10 J8 J15 J26 GND GND Setup Hold Clock out Clock Clock J16 Deskew Int Ext J15 Ext Int Clock select J19 Jump...

Страница 68: ...d SELF_CAL pass Voltage reference BNC cable 0 1 F Capacitor Adjustment verification fixture J7 J6 Fixture supply J26 Dual banana to BNC adapter J22 J14 Threshold out P6434 C2 C3 CK3 Channel Group Figu...

Страница 69: ...LF_CAL pass Adjustment verification fixture J2 J1 J26 Fixture supply J4 Clock channel C2 C3 CK3 Channel Group J5 Figure 4 6 Initial FPV_Setup_0F test setup 1 If the logic analyzer application is runni...

Страница 70: ...LF_CAL pass Adjustment verification fixture J2 J1 J26 Fixture supply J4 Clock channel C2 C3 CK3 Channel Group J5 Figure 4 7 Initial FPV_Hold_0F test setup 1 If the logic analyzer application is runnin...

Страница 71: ...own in Figure 4 8 Diagnostics and SELF_CAL pass Adjustment verification fixture Sine wave generator Type N to BNC adapter J18 Fixture supply J26 J2 J1 J4 Clock channel J5 BNC cable C2 C3 CK3 Channel G...

Страница 72: ...t list for the procedures in this section Each piece of equipment used in these procedures is referenced by an item number to the equipment listed in Table 4 1 Functional Verification The functional v...

Страница 73: ...4 Prerequisites Warm up time 30 minutes for adjustment verification fixture and test equipment 1 Set the jumper positions as called out in the table Refer to Figure 4 9 on page 4 23 for jumper locati...

Страница 74: ...ng edge Jumper removed clocked on rising edge SETUP HOLD J17 Setup Hold select External Clock in J5 J14 1 2 3 4 5 J13 P6434 Deskew Probe setup J4 PROBE SETUP DESKEW R127 R39 R67 R321 R85 R38 VDD adjus...

Страница 75: ...ent for CH1 Frequency H Gating Off e Set up the Cursor menu as follows H Function Off f Set up the Acquire menu as follows H Acquisition Mode Sample H Repetitive Signal On 6 Using the oscilloscope and...

Страница 76: ...ng requirements are met H The adjustment verification fixture must have been operating for a warm up period of at least 30 minutes and must be operating at an ambient tempera ture between 20_ C and 30...

Страница 77: ...ary function of the custom probe tip adapter is to minimize the length of the ground lead of the probe Build the custom probe tip adapter as shown in Figure 4 10 Adjust this distance to span a 1206 SM...

Страница 78: ...etest you must start at the first test and follow this section through from start to finish sequentially The following procedures check the DC power supply characteristics Parameter tested Power suppl...

Страница 79: ...adjust J8 VEE J9 GND J10 VDD Threshold in J22 DC in Denotes ground side of resistor 1 6 Figure 4 11 Adjustment verification fixture detail Table 4 6 Adjustment verification fixture jumper settings Jum...

Страница 80: ...ication fixture and test equipment 1 Set the jumper positions as listed in the table Jumper Jumper name Jumper setting J13 P6434 Deskew probe setup 3 5 connected J15 Clock selection INT J16 Deskew 2 3...

Страница 81: ...ble Jumper Jumper name Jumper setting J13 P6434 Deskew probe setup 3 5 connected J15 Clock selection INT J16 Deskew 2 3 and 4 5 connected J17 Setup hold select HOLD J19 Clock polarity select Removed 2...

Страница 82: ...serve proper polarity when doing the following steps See Figure 4 9 on page 4 23 to identify the ground side of the components being measured 6 Connect the CH1 probe of the oscilloscope to the custom...

Страница 83: ...Jumper setting J13 P6434 Deskew probe setup 1 3 and 5 6 connected J15 Clock selection INT J16 Deskew 1 2 and 4 5 connected J17 Setup hold select HOLD J19 Clock polarity select Disconnected 2 Set up t...

Страница 84: ...to J1 2 on the adjustment verifi cation fixture 5 Select Deskew from the Vertical menu NOTE Observe proper polarity when performing the following steps See Figure 4 9 on page 4 23 to identify the grou...

Страница 85: ...item 4 Custom probe tip adapter see Figure 4 10 page 4 26 Prerequisites Warm up time 30 minutes for adjustment verification fixture and test equipment 1 Set the jumper positions as listed in the table...

Страница 86: ...Mode Average 90 H Repetitive Signal On 4 Connect the CH2 probe of the oscilloscope to J1 pin 2 on the adjustment verification fixture 5 Select Deskew from the Vertical menu of the oscilloscope NOTE Ob...

Страница 87: ...tup time at R321 on the Calibration Data Report Use the following procedure to verify the external clock input Parameter tested External Clock Input Equipment required Frequency Counter item 8 Signal...

Страница 88: ...number Serial number Certificate number Verification performed by Verification date System Clock Test Data Characteristic Specification Tolerance Procedure reference Incoming data Outgoing data Clock...

Страница 89: ......

Страница 90: ...djustments should be done after repair or when any performance verification tests have failed Prerequisites These procedures ask for the serial number of the instrument under test You can access the s...

Страница 91: ...ence consists of one or more individual adjustments Normally you will perform a RUN FULL SEQUENCE which executes each adjustment in the proper order The performance verification and adjustment softwar...

Страница 92: ...ct identification information and temperature and humidity 2 If you are using P6417 or P6418 probes label one probe as the Reference Probe and the other probe as the Probe Under Test 3 If you are usin...

Страница 93: ...d on and has the proper warm up time H Verify that the adjustment verification fixture LED is lighted the jumper positions match the on screen instructions and the external connections are correct H R...

Страница 94: ...imits is accomplished by performing the performance verification procedures When to Perform the Self Calibration You can run the self calibration at any time during normal operation To maintain measur...

Страница 95: ...cedure H Once a year H If you have replaced the acquisition board the probe constants are stored on the acquisition board This procedure checks and adjusts the time alignment of all channels There are...

Страница 96: ...he adjustment verification fixture for performing the deskew test Observe proper polarity pin 1 to pin 1 4 Follow the on screen prompts to perform the adjustment procedure 5 Verify no failures occur f...

Страница 97: ...TLA600 Adjustment Procedures 5 8 TLA600 Series Logic Analyzer Service Manual...

Страница 98: ...meet or exceed the minimum requirements specified Adjustment Verification Fixture Adjustment Equipment Required Adjustment verification fixture and power supply item 2 Oscilloscope item 3 Two 1 M 10X...

Страница 99: ...ply Equipment Required DMM with test leads item 9 Prerequisites Warm up time 30 minutes for adjustment verification fixture and test equipment 2 Connect the DMM lead to J8 VEE 3 Connect the DMM lead t...

Страница 100: ...Deskew Int Ext J15 Ext Int Clock select J19 Jumper installed clocked on falling edge Jumper removed clocked on rising edge Setup Hold J17 Hold Setup select External Clock in J5 J14 1 2 3 4 5 J13 P6434...

Страница 101: ...em 16 Shorting jumpers item 14 Prerequisites Warm up time 30 minutes for adjustment verification fixture and test equipment 1 Set up the frequency counter as follows a Right input 10 Hz 100 MHz b Sele...

Страница 102: ...t up the oscilloscope by pressing Setup and then press Factory Setup and then press OK Confirm Factory Init to return the oscilloscope to default conditions 2 Set up the oscilloscope as listed below a...

Страница 103: ...ircuit board add delay according to their length The longer the loop the more delay is added to the circuit The loops from shortest to longest add approximately 50 ps 100 ps 200 ps 400 ps and 800 ps r...

Страница 104: ...wing jumpers Jumper Jumper name Jumper setting J13 P6434 Deskew probe setup 3 5 connected J15 Clock selection INT J16 Deskew 2 3 and 4 5 connected J17 Setup hold select HOLD J19 Clock polarity select...

Страница 105: ...to R67 P6434 A and record the positive delay between R85 and R67 using the vertical cursor bars on the oscilloscope 6 Using the delay taps on Delay CLK1 ADJ add or subtract the appropriate delay to e...

Страница 106: ...g jumpers Jumper Jumper name Jumper setting J13 P6434 Deskew probe setup 1 3 and 5 6 connected J15 Clock selection INT J16 Deskew 1 2 and 4 5 connected J17 Setup hold select HOLD J19 Clock polarity se...

Страница 107: ...ge on the center horizontal graticule 4 Connect the CH1 probe to R127 and record the difference in timing between R67 and R127 using the vertical cursor bars on the oscilloscope 5 Using the delay taps...

Страница 108: ...ting jumpers item 14 Prerequisites Warm up time 30 minutes for adjustment verification fixture and test equipment 1 Install the following jumpers Jumper Jumper name Jumper setting J13 P6434 Deskew pro...

Страница 109: ...up the Cursor menu as follows H Function V Bars f Set up the Acquire menu as follows H Acquisition Mode Sample H Repetitive Signal On 4 Using the delay taps on Delay SETUP ADJ add or subtract the appr...

Страница 110: ...ccess to the logic analyzer adhere to the following precautions to avoid damaging internal circuit boards and their components due to electrostatic discharge ESD CAUTION Many components within the cha...

Страница 111: ...essary If there is damage or deficiency contact your local Tektronix representative Cleaning procedures consist of exterior and interior cleaning of the chassis Clean the chassis as needed based on th...

Страница 112: ...logic analyzer display is a soft plastic display and must be treated with care during cleaning CAUTION Improper cleaning agents or methods can damage the flat panel display Avoid using abrasive cleane...

Страница 113: ...Maintenance 6 4 TLA600 Series Logic Analyzer Service Manual...

Страница 114: ...edure in this subsection disconnect the power cord from the line voltage source Failure to do so could cause serious injury or death General Instructions NOTE Read the following general instructions b...

Страница 115: ...5 size screw heads 640 247 4 T 20 Torx tip Used for removing the handle hardware TorxR driver bit for T 20 size screw heads 640 250 5 1 8 inch flat bladed screwdriver Screwdriver for unlocking cable c...

Страница 116: ...over trim from the instrument 5 Remove the carrying handle and right left side trim a Remove the T 20 Torxdrive screws that secure the handle to the instrument Remove the handle from the instrument b...

Страница 117: ...he chassis b Remove the seven T 15 Torxdrive screws that secure the covers to the bottom of the chassis c Pull the bottom right cover down and slide to the right to remove from the instrument Pull the...

Страница 118: ...eft side trim Front panel trim Right side trim T 15 Torxdrive screw 4 Top cover trim Carrying handle T 15 Torxdrive screw 3 Input panel To remove the trim ring grasp its top edge and flex it toward yo...

Страница 119: ...gic Analyzer Service Manual Left side trim T 15 Torxdrive screw 4 Top cover trim Closed face trim To remove the trim ring grasp its top edge and flex it toward you before pulling upward Snap stud 4 Fi...

Страница 120: ...ies Logic Analyzer Service Manual 6 11 Top left cover Bottom right cover Bottom cover All left and right cover mounting holes are indicated as shown T 15 Torxdrive screw 5 T 15 Torxdrive screw 11 T 15...

Страница 121: ...er follow these instructions 1 Remove the trim and covers by following the procedure on page 6 7 2 Install the memory in the location shown in Figure 6 4 Memory board s Figure 6 4 Memory board locatio...

Страница 122: ...s as shown in Figure 6 5 page 6 14 b Grasp the top edge of the Display assembly and pull forward far enough to allow access to the flex cable connector c Disconnect J2 flex cable from the display asse...

Страница 123: ...ing 1 Remove the trim and covers by following the procedure on page 6 7 2 Remove the display assembly by following the procedure on page 6 18 3 Remove the Display Adapter Board See Figure 6 6 page 6 1...

Страница 124: ...on page 6 18 3 Orient the oscilloscope Set the oscilloscope so its bottom is down on the work surface and its front is facing you 4 Remove the Standby On Switch flex circuit See Figure 6 7 page 6 16...

Страница 125: ...it connector aligns with J3 on the Display Adapter circuit board c Align the holes in the flex circuit to the two index posts on the front side of the Display assembly d Firmly press the flex circuit...

Страница 126: ...alyzer as shown in Figure 6 8 2 Disconnect the ribbon cable connector J2 from the display circuit board To install the closed face bracket follow these instructions 3 Connect the ribbon cable connecto...

Страница 127: ...ht out from the front panel 1 4 inch to create some clearance between the base of the knob and the front panel Insert the angled tip tweezers between the knob and front panel and use them to remove th...

Страница 128: ...the six T 15 Torxdrive screws that secure the Front panel assembly to the front chassis See Figure 6 10 page 6 20 b Grasp the top of Front Panel assembly and pull forward to allow access to the ribbo...

Страница 129: ...cedures 6 20 TLA600 Series Logic Analyzer Service Manual Front panel assembly Front panel square opening 2 T 15 Torxdrive screw 6 Floppy disk support tab 2 Chassis slot 2 JR1 ribbon cable Figure 6 10...

Страница 130: ...knobs by following the procedure on page 6 17 3 Remove the front panel assembly by following the procedure on page 6 18 4 Remove the Front Panel board See Figure 6 12 page 6 12 a Remove the eight T 15...

Страница 131: ...g the procedure on page 6 18 4 Remove the front panel board by following the procedure on page 6 21 5 Remove the Front Panel keypad a Pull on each of the keypad support guides to separate the keypad f...

Страница 132: ...when removing or installing the keyboard pad 6 Reinstallation Do in reverse steps to reinstall the Keypad front panel board and the front panel assembly Then see the following instructions a Make sur...

Страница 133: ...Remove the four T 15 Torxdrive screws that secure the hard disk drive bracket to the chassis 7 Lift the hard disk drive and bracket out of the chassis 8 Remove the four 1 phillips screws that secure...

Страница 134: ...dures TLA600 Series Logic Analyzer Service Manual 6 25 T 15 Torxdrive screw 4 Hard disk drive Hard disk drive bracket Hard disk drive assembly 0 Philips screw 4 Hard disk drive ribbon cable Figure 6 1...

Страница 135: ...he floppy disk drive and bracket toward the rear of the chassis and remove it from the instrument 6 Remove the two 0 phillips screws that secure the floppy disk drive to the bracket 7 Lift out the old...

Страница 136: ...allation Procedures TLA600 Series Logic Analyzer Service Manual 6 27 Floppy disk drive bracket Floppy disk drive cable Floppy disk drive T 15 Torxdrive screw 2 0 Philips screw 2 Figure 6 14 Floppy dis...

Страница 137: ...wer connector J890 from the interface circuit board 5 Slide the CD ROM out of the instrument to allow you to access to the CD ROM signal connector J250 on the riser circuit board 6 Disconnect signal c...

Страница 138: ...Removal and Installation Procedures TLA600 Series Logic Analyzer Service Manual 6 29 CD ROM drive J890 cable J250 ribbon cable Phillips drive screw 4 Microprocessor Figure 6 15 CD ROM drive location...

Страница 139: ...d out of the bracket by disconnecting it from the riser adapter board connector 8 Remove the two T 15 Torxdrive screws that secure the riser board to the CPU board and remove the riser adapter board 9...

Страница 140: ...6 31 Leave hard disk drive cable attached T 15 Torxdrive screw 4 CPU board T 15 Torxdrive screw 2 3 16 Inch nut post 6 T 15 Torxdrive screw 4 Riser adapter board T 15 Torxdrive screw 4 CPU board asse...

Страница 141: ...ush down and pull out on the holding bracket located nearest to the outer edge of the circuit board c Pull out and unlatch the remaining bracket Lift the fan heatsink assembly out from the microproces...

Страница 142: ...TLA600 Series Logic Analyzer Service Manual 6 33 Fan and heatsink Locking lever J1H power cable NLX board Push down and pull out to release clamp Microprocessor Push down and pull out to release clamp...

Страница 143: ...t secure them to the rear chassis 7 Remove the five T 15 Torxdrive screws that secure the interface board to the rear chassis 8 Remove the seven T 15 Torxdrive screws that secure the interface board t...

Страница 144: ...es Logic Analyzer Service Manual 6 35 Chassis support T 15 Torxdrive screw 5 Fan connector extender cable 2 Rear power distribution circuit board IA bus circuit board Interface board T 15 Torxdrive sc...

Страница 145: ...15 Torxdrive screws that secure the acquisition board to the bottom chassis 6 Remove the six T 15 Torxdrive screws that secure the acquisition board to the front chassis 7 Remove the old acquisition...

Страница 146: ...es TLA600 Series Logic Analyzer Service Manual 6 37 Acquisition board T 15 Torxdrive screw 6 T 15 Torxdrive screw 7 Front power distribution board Rear power distribution board IA bus board Figure 6 1...

Страница 147: ...200 I A board 3 Remove the two T 15 Torxdrive screws securing the low voltage power supply to the right side chassis support See Figure 6 20 4 Remove the three T 15 Torxdrive screws securing the low v...

Страница 148: ...on page 6 40 Replacing the Fan Assembly To replace the fans follow these instructions 1 Remove the trim and covers by following the procedure on page 6 7 2 Disconnect the two fan power cables at the...

Страница 149: ...er follow these steps 1 Plug the power cord in and turn the logic analyzer on 2 Exit all applications and close any open windows 3 Click Start in the Windows tool bar 4 Select Programs from the Start...

Страница 150: ...ion and procedures designed to help you isolate faults to within the logic analyzer The process is as follows H Do Check for Common Problems on page 6 42 to eliminate easy to find problems first H Do...

Страница 151: ...creen s is are blank logic analyzer emits no beeps H SO DIMMs incorrectly installed or missing H Defective controller board External monitor does not power on H Monitor power cord not plugged in H Fai...

Страница 152: ...ble from inverter board to backlighting display lamp H Defective backlighting display lamp H Faulty display H Faulty controller board H Faulty inverter board H Faulty front panel interface board BIOS...

Страница 153: ...ADG VXI Addr Test n ADG VXI Data Test n Interrupt Lines n n Trigger Lines n n The logic analyzer performs BIOS and TLA application diagnostics every time you turn it on The diagnostics window display...

Страница 154: ...orrectly in the CMOS setup The hard disk drive may not be connected correctly The hard disk drive may be defective Verify the hard disk drive is configured correctly in the CMOS setup Verify that the...

Страница 155: ...tional message Verify that the CMOS setup is configured correctly Real time clock error The real time clock may be defective Replace the controller board Shadow Ram Failed at offset nnnn The shadow RA...

Страница 156: ...strial stapler or strapping tape Shipping to the Service Center Contact the Service Center to get an RMA return material authorization number and any return or shipping information you may need If the...

Страница 157: ...Repackaging Instructions 6 48 TLA600 Series Logic Analyzer Service Manual...

Страница 158: ...stalled in the instrument Probe Options Table 7 1 Probe options Instrument Option Probe Quantity TLA601 TLA611 TLA621 1P P6418 2 2P P6434 1 3P P6417 2 TLA602 TLA612 TLA622 1P P6418 4 2P P6434 2 3P P64...

Страница 159: ...Options 7 2 TLA600 Series Logic Analyzer Service Manual...

Страница 160: ...TLA600 Series Logic Analyzer Service Manual 8 1 Electrical Parts List Refer to the Mechanical Parts List chapter for a complete list and description of all replaceable parts...

Страница 161: ...Electrical Parts List 8 2 TLA600 Series Logic Analyzer Service Manual...

Страница 162: ...yboard and audio PCI USB Riser ECB To HDD FDD CDROM Interface ECB Connect to exit Trig in out CardBus LCD front panel keypad interface fan cntl PCI to ISA ISA to VTC Power supply Power Dist front ECB...

Страница 163: ...ies Logic Analyzer Service Manual Interconnection Block Diagram NLX board Riser Interface board Power supply LPU ACQ board Power bus front Power bus Rear PA bus board Figure 9 2 Logic analyzer interco...

Страница 164: ...ck Diagram NLX motherboard and riser Interface board Front panel control LPU ACQ CDROM Acquistion Floppy Removable HD SVGA I LAN Mouse Keyboard COM1 Parallel USB SVGA II LCD Trig I O Sig I O 2 x Cardb...

Страница 165: ...Diagrams 9 4 TLA600 Series Logic Analyzer Service Manual...

Страница 166: ...er a part that has been replaced with a different or improved part your local Tektronix field office or representative will contact you concerning any change in part number Tektronix part numbers cont...

Страница 167: ...ndex Number Figure and index numbers in the exploded view illustrations 2 Tektronix Part Number Use this part number when ordering replacement parts from Tektronix 3 and 4 Serial Number Column 3 indic...

Страница 168: ...WEST SEATTLE WA 98119 2783 26003 MARTEK POWER MDI 4115 SPENCER STREET TORRANCE CA 90503 2489 2W733 BELDEN WIRE CABLE COMPANY 2200 US HWY 27 SOUTH PO BOX 1980 RICHMOND IN 47374 2W733 BELDEN WIRE CABLE...

Страница 169: ...AVERTON OR 97008 7163 TK2383 PANASONIC INDUSTRIAL CO 1600 MCCANDLESS DR MILPITAS CA 95035 TK2548 XEROX CORPORATION 14181 SW MILLIKAN WAY BEAVERTON OR 97005 TK2647 INSTRUMENT SPECIALTIES CO INC C O TEM...

Страница 170: ...HOLDER 5 X 20MM FUSES EUROPEAN 61935 FEK 031 1663 9 200 4522 00 1 COVER RIGHT PCABS 13 645L X 8 250W BLUE TK6181 200 4522 00 10 212 0232 00 2 SCREW MACHINE 8 32 X 1 125L PNH STL BLACK OXIDE T 20 0KB01...

Страница 171: ...R IDENT LABEL MKD TLA621 0KB05 335 0332 00 20 335 0333 00 1 MARKER IDENT LABEL MKD TLA622 0KB05 335 0333 00 20 335 0334 00 1 MARKER IDENT LABEL MKD TLA623 0KB05 335 0334 00 20 335 0335 00 1 MARKER IDE...

Страница 172: ...Mechanical Parts List TLA600 Series Logic Analyzer Service Manual 10 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 16 17 18 19 20 21 22 23 Figure 10 1 External parts...

Страница 173: ...2 671 4823 01 1 CIRCUIT BD ASSY FRONT PANEL 80009 671 4823 01 13 260 2726 00 1 SWITCH KEYPAD ELASTOMERIC FRONT PANEL 22670 260 2726 00 14 333 4333 01 1 PANEL FRONT CONTROL TLA600 SERIES 0KB05 333 4333...

Страница 174: ...st TLA600 Series Logic Analyzer Service Manual 10 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2 25 2 2 2 2 2 26 27 28 29 30 31 20 18 2 32 Figure 10 2 Front panel display hard driv...

Страница 175: ...effective Serial no discont d Qty Name description Mfr code Mfr part number 2 30 174 4321 00 1 CA ASSY FLAT FLEX 26POS 10 440L 0 039 CTR FRONT PANEL TO INTERFACE BD TLA61X TLA62X 060D9 174 4321 00 31...

Страница 176: ...Mechanical Parts List TLA600 Series Logic Analyzer Service Manual 10 11...

Страница 177: ...4 NUT PLAIN HEX 0 5 28 X 0 562 HEX BRS CD PL 73743 ORDER BY DESCRIPTION 10 211 0887 00 4 SCREW METRIC M2 X 0 4 X 16 MM L PH PHILLIPS 0KB01 211 0887 00 11 671 4822 00 1 CIRCUIT BD ASSY INTERFACE DISPL...

Страница 178: ...Mechanical Parts List TLA600 Series Logic Analyzer Service Manual 10 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 4 4 4 4 18 19 20 21 Figure 10 3 Power supply processor and CD drive...

Страница 179: ...CLIPS BRACKET TLA624 80009 672 1603 00 1 407 4818 00 2 BRACKET EMC GROUNDING ACQUISITION 0 050 AL TLA600 SERIES TK1943 407 4818 00 2 211 0105 00 4 SCREW MACHINE 4 40 X 0 188 FLH STL CD POZ 1AW87 MACH...

Страница 180: ...6 CH 1M ACQUISITION PROCESSOR TLA624 80009 671 5243 00 7 211 1050 00 13 SCREW MACHINE 6 32 X 0 312 L PNH CAD PLT T15 0KB01 OBD 8 407 4811 00 1 BRACKET ECB ACQUISITION AL TLA600 SERIES TK1943 407 4811...

Страница 181: ...KINGDOM S3109 209010 161 0066 10 1 CA ASSY PWR 3 1 0 MM SQ 250V 10A 2 5 UNITED KINGDOM PLUG TK2541 ORDER BY DESCRIPTION 4 161 0167 00 1 CA ASSY PWR 3 0 75MM SQ 250V 10A 2 5 M OPTION A5 SWITZERLAND S3...

Страница 182: ...SDRAM 8MEG X 64 SYNC MODULE UNBUFFERED 3 3V MC 458CB646 A10 6Y440 MT8LSDT864AG 10 EC7 650 4209 04 1 DISK DRIVE ASSY WINCHESTER 2 5 IN 10 0GB SINGLE PLATTER W SOFTWARE TLA600 SERIES 80009 650 4209 04...

Страница 183: ...4 1 8 210 0457 00 6 NUT PL ASSEM WA 6 32 X 0 312 STL CD PL W LOCKWASHER 0KB01 ORDER BY DESCR 9 348 0048 00 6 FOOT CAMERA BLACK VINYL W 6 32 STUD 80009 348 0048 00 10 210 0586 00 4 NUT PL ASSEM WA 4 40...

Страница 184: ...Mechanical Parts List TLA600 Series Logic Analyzer Service Manual 10 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Figure 10 6 Adjustment verification fixture exploded view...

Страница 185: ...Mechanical Parts List 10 20 TLA600 Series Logic Analyzer Service Manual...

Страница 186: ......

Страница 187: ......

Страница 188: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Отзывы: