ENGLISH
14
1.
Install the autoclave in environments suitable to sterilization.
2.
The premises have to be suitably lit and ventilated, in compliance with regulations in
force.
3.
Install the autoclave away from heat sources and water splashes.
4.
Position the autoclave on a surface, suitable to support the weight (80 Kgs.) and with
adequate dimensions.
5.
Place the autoclave at a height allowing easy intervention by the operator for inspection
and clearing of the whole sterilization chamber.
6.
Open the door of the autoclave and remove all packages containing the single
accessories from inside the sterilization chamber.
7.
Leave inside the sterilization chamber only the tray carrier with the trays. All other
accessories should be positioned in a separate space available to operators.
8.
Don’t put anything on the autoclave.
9.
Do not lean on the door.
10.
Leave a space of at least 5 cm in the rear of the autoclave, using the spacer
(Fig.A
–
pos.
0
/ Fig.8) and in the sides of the unit to ensure the ventilation required.
11.
Make connections of supplied pipes in the back
(chapter 7).
12.
Always make sure the electrical system to which the autoclave is to be connected is in
conformity with the legislation in force and sized to suit the specifications of the said
device.
13.
Connect the power supply cord to the socket on the rear panel of the autoclave
(Fig.A
–pos.
5
).
14.
Connect the electrical plug to the system ensuring that it is adequate to the supply of the
machine.
NOTE:
Do not use extensions, reducers or adapters for connection as this could
cause micro interruptions with consequent generation of alarm signals.
15.
Turn the autoclave on by pressing the mains switch (Fig.A-pos.
10
)
and open the hatch
of the autoclave itself.
Wait a few seconds, there will be two acoustic signals to inform
you of the acquisition of the parameters for the automatic barometric alignment, at the
same time the text
DOOR OPEN
will appear on the display.
NOTE:
Never select a command before hearing the two sound signals, the
autoclave will not accept the chosen programming.
Содержание AB015ZXY
Страница 28: ...ITALIANO 26 Figura 3 visualizzazione della registrazione di un ciclo Vacuum...
Страница 34: ...ITALIANO 32 Figura 10 Cartella esplorata con LogViewer e cartella di destinazione dei file prodotti...
Страница 70: ...ENGLISH 26 Figure 3 log viewing mode of Vacuum cycle...
Страница 76: ...ENGLISH 32 Figure 10 Browsed folder with LogViewer and destination folder of made files...
Страница 112: ...FRAN AIS 26 Figure 3 affichage de l enregistrement d un cycle vacuum vide...
Страница 118: ...FRAN AIS 32 Figure 10 Dossier explor avec LogViewer et dossier de destination des fichiers produits...
Страница 154: ...DEUTSCH 26 Darstellung 3 Veranschaulichung von der Aufzeichnung eines Vakuumzyklus...
Страница 160: ...DEUTSCH 32 Darstellung 10 Mit LogViewer entdeckte Datei und Zieldatei der erstellten Dateien...
Страница 196: ...ESPA OL 26 Figura 3 visualizaci n del registro de un ciclo Vacuum...
Страница 202: ...ESPA OL 32 Figura 10 Carpeta explorada con LogViewer y carpeta de destino de los archivos creados...
Страница 238: ...PORTUGU S 26 Figura 3 visualiza o do registo de um ciclo Vacuum...
Страница 244: ...PORTUGU S 32 Figura 10 Pasta explorada com LogViewer e pasta de destina o dos ficheiros produzidos...
Страница 255: ......