50
cm
19
.7
in
_ES
_EN
All of the operations illustrated in this section are to be exclusively ca-
rried out by specialised technicians, those who have to organise the
all times within the rigorous application of current standards regarding
this matter
3.1 Place of installation
3.Installation
The following requirements must be met before installing the machine in the establishment:
That the network voltage coincides with
label.
Must be installed in a place where it can be
Operating room temperature:
15 °C and 40 °C.
That the laws and current technical
standards are complied with when carr-
ying out the installation.
Easy access to the plug.
Lateral separation distance is not necessary:
10