ES_
EN_
2
1
3
5
4
6
1
2
3.2 Moving and Unpacking
3.Installation
Once the machine has been received, it must be moved to the place where it will be installed:
Lifting and moving
Before moving
Moving the machine must be done
by at least two people in a vertical
position.
Make sure that nobody is within
the lifting and load movement ope-
ration radius and, in particularly
who control the movements to be
carried out.
Control the route
Avoid bumpy routes, paying atten-
tion to the dimensions and possible
protruding parts.
Cut the nylon straps
It is prohibited to make additional
cuts in the packaging.
Lift the cover
Placing
Try not to damage the
packaging as it could be
used again in the future.
In the established
place and to con-
nect to the network.
-
ment of parts that may get damaged must be paid for by the client.
3.3 Setting up
3.Installation
Washing and sanitisation
It is recommendable to carry out ca-
reful cleaning and sanitisation of the
machine. (See Cleaning section)
Consult “Settings” section.
11