![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530004.webp)
I-3
V.
MAINTENANCE & MAINTENANCE PROCEDURES
V-A. The Hull
V-B. The Deck And Cabin Top
V-C. Interior Woodwork
V-D. Spars, Rigging, And Sails
V-E. Auxiliary Engines & Related Systems
V-F. Electrical Systems
V-G. Plumbing and Sanitation Systems
LIST OF ILLUSTRATIONS AND TABLES
Drawing
Tayana 37 Cutter Sail Plan
Tayana 37 Ketch Sail Plan
Tayana 37 Deck Plan
Tables
ELECTRICAL SYSTEMS/The Energy Audit System
(Table IV.-1)
ELECTRICAL SYSTEMS/The 12 Volt System
(Electric Wire Number & color Codes-Table V.-1.)
Figure
CONSTRUCTION. Thiokol Joints (Figure II.-l.)
FUEL SYSTEM - (Figure IV.-1.)
FRESH HOT AND COLD WATER SYSTEM - (Figure
IV.-2.)
AUXILIARY ENGINES/Installation
Exhaust And Engine Mounting -(Figure V.-1.)
ELECTRICAL SYSTEMS/The 12 Volt D.C. System
(Figure V.-2.)
PLUMBING AND SANITATION SYSTEMS/Bilge Pumping
Systems - (Figure V.3.)
Содержание 37
Страница 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Страница 7: ...I 6...
Страница 8: ...I 7...
Страница 9: ...I 10...
Страница 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Страница 14: ...II 3 Polars for Tayana37 Cutter...
Страница 18: ...II 7...
Страница 45: ...IV 8...
Страница 54: ...IV 17...
Страница 69: ...V 13...
Страница 76: ...V 20...
Страница 80: ...V 24 moisture eliminating product...
Страница 81: ...V 25...