![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530027.webp)
III-6
ENGINE INSTALLATION
YES
NO
CORRECTED
All mounting bolts tight
Engine aligned to .002 max. clearance
Coupling bolts tight
Shaft set screw tight and secured with safety wire
Crankcase oil level full
Transmission gear box oil level full
Throttle/shift linkage secure
Engine stop connection secure
Drain plugs installed and petcocks closed
.
LIFELINES, PULPITS AND STANCHIONS
YES
NO
CORRECTED
Pulpits and stanchions secure
Lifelines properly tensioned
Lifeline end fittings safety-wired
Gates function properly
Lifeline wires free of physical damage
SPARS AND STANDING RIGGING (Pre-Stepped)
YES
NO
CORRECTED
Mast free of physical damage
Rigging free of physical damage
Mast wiring and lights functional
Masthead pins secured
Spreaders fit and properly secured
Standing rigging and topping lift _ properly fastened to
spar and pinned
All fasteners tight
Halyards installed
Содержание 37
Страница 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Страница 7: ...I 6...
Страница 8: ...I 7...
Страница 9: ...I 10...
Страница 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Страница 14: ...II 3 Polars for Tayana37 Cutter...
Страница 18: ...II 7...
Страница 45: ...IV 8...
Страница 54: ...IV 17...
Страница 69: ...V 13...
Страница 76: ...V 20...
Страница 80: ...V 24 moisture eliminating product...
Страница 81: ...V 25...