![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530024.webp)
III-3
5. Prepare and paint bottom. For maximum anti-foulant life, a full second
coat of bottom paint is recommended.
6. Launch and inspect all underwater fittings for leaks.
7. Fill fuel, water, and propane tanks and search for leaks.
8. Install pulpits, stanchions, and lifeline lines. Safety lifeline ends and gates.
9. Install standing and running rigging on mast. Check mast wiring and
lights.
10. Step mast, set up and adjust rig, pin and tape all turnbuckles, check
halyards and install mast boot, if required t-mast boot not supplied.
11. Reeve sheets, bend on and hoist sails, furl sails.
12. Align engine to .002" max. clearance.
13. Check oil and water level in engine.
14. Complete installation of owner or dealer supplied equipment.
15. Check battery condition and recharge, if necessary.
16. Check engine operation.
17. Check operation of all systems and equipment.
18. Check all doors and drawers for proper movement and secure latching.
19. Water test decks, fittings, and ports and search for leaks.
20. Sea trial under power and sail.
21. Re-check for leaks in interior plumbing systems (fuel, water, and waste)
and exterior hardware.
22. Clean interior and exterior of yacht thoroughly.
Содержание 37
Страница 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Страница 7: ...I 6...
Страница 8: ...I 7...
Страница 9: ...I 10...
Страница 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Страница 14: ...II 3 Polars for Tayana37 Cutter...
Страница 18: ...II 7...
Страница 45: ...IV 8...
Страница 54: ...IV 17...
Страница 69: ...V 13...
Страница 76: ...V 20...
Страница 80: ...V 24 moisture eliminating product...
Страница 81: ...V 25...