![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530026.webp)
III-5
DELIVERY INSPECTION
YES
NO
CORRECTED
Boat properly cradled
Spars properly cradled
Free of sideswipe damage
Companionway seals unbroken
Absence of exterior hardware theft
Loose gear inventory complete
Propeller secured properly
Rudder moves freely
Prop shaft turns freely
All below waterline fastenings are tight
All plumbing thru-hulls connected and securely fastened
All thru-hull valves closed
LAUNCHING INSPECTION
YES
NO
CORRECTED
Boat properly slung during launch
No damage during launch
Thru-hull fittings leak-free
Rudder bearing leak-free
Shaft packing nuts adjust to 1 drop/30 seconds with
engine off
Thru-hull valves, connecting and plumbing leak-free with
valves open
Содержание 37
Страница 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Страница 7: ...I 6...
Страница 8: ...I 7...
Страница 9: ...I 10...
Страница 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Страница 14: ...II 3 Polars for Tayana37 Cutter...
Страница 18: ...II 7...
Страница 45: ...IV 8...
Страница 54: ...IV 17...
Страница 69: ...V 13...
Страница 76: ...V 20...
Страница 80: ...V 24 moisture eliminating product...
Страница 81: ...V 25...