![background image](http://html1.mh-extra.com/html/tayana/37/37_operation-and-maintenance-manual_3744530003.webp)
I-2
TABLE OF CONTENTS
I.
INTRODUCTION
.
II.
SPECIFICATIONS
II-A. General Design Specifications
II-B. Serial Numbers
II-C. Materials
II-D. Construction
II-E. Importer's Documents
II-F. Procedures & Data For Documentation .
III.
COMMISSIONING AND DECOMMISSIONING
III-A. Initial Commissioning
III-B. Owner Commissioning
III-C. Decommissioning for Storage
III-D. Recommissioning After Lay-Up
IV.
OPERATING PROCEDURES
IV-A. Sailing The Tayana 37 Cutter
IV-B. Sailing The Tayana 37 Ketch
IV-C. Tuning The Spars And Rigging
IV-D. Tuning Under Sail
IV-E. Handling Under Power
IV-F. Fuel System
IV-G. Electrical Systems
IV-H. The Plumbing Systems
Содержание 37
Страница 1: ...Chapter I OPERATIONS AND MAINTENANCE MANUAL Chapter 1...
Страница 7: ...I 6...
Страница 8: ...I 7...
Страница 9: ...I 10...
Страница 10: ...I 11 BARIENT WINCH 22 WINCH ASSEMBLY...
Страница 14: ...II 3 Polars for Tayana37 Cutter...
Страница 18: ...II 7...
Страница 45: ...IV 8...
Страница 54: ...IV 17...
Страница 69: ...V 13...
Страница 76: ...V 20...
Страница 80: ...V 24 moisture eliminating product...
Страница 81: ...V 25...