Rosemount TankRadar Rex
Chapter 1 Checks and Adjustments
1-18
Commissioning Manual
308011En, Ed.2/Rev.B
June 2008
Old systems with three verification pins
pin 1: top pin is placed at approximately 95% of the tank height (not
closer than 1.5 m from the flange).
pin 2: at 50% of the tank height.
pin 3: at approximately 20% of the tank height (not less than 0.8 m above
the lower end of the pipe).
If the tank is less than 7 meters high, only two verification pins are used.
Figure 1-17 Three verification pins and deflection plate.
Still-pipe
Verification pin
Deflection plate