Power-Up Procedure
2. Installation
PDRP-1002 Instruction Manual PN 51135:B0 04/06/01
31
Power-Up Procedure
WARNING: Prior to energizing this panel, notify all personnel and authorities, including any
personnel who may be working on, around, or near this unit.
WARNING: Battery contains sulfuric acid which can cause severe burns to the skin and eyes and
can destroy fabrics. If contact is made with sulfuric acid, immediately flush the skin or eyes with
water for 15 minutes and seek immediate medical attention.
CAUTION:
Observe polarity of batteries. Improper connection will cause damage and VOID
WARRANTY.
Follow these steps to power-up the FACP:
1.
Conduct Visual Inspection.
A careful visual inspection should be made before applying power to
the system. See “Inspection” on page 53.
2.
Notification.
Notify personnel who may be working with the AC power circuits before removing
the “Out of Service” tag.
3.
Apply Primary Power.
Switch the circuit breaker to the ‘closed’ position, providing power to the
circuit.
• The green AC power LED will illuminate.
• The Trouble LED will illuminate until battery power is applied.
4.
Connect Secondary Power.
Connect battery interconnect wire as shown below.
• The trouble LED will clear. If the trouble light does not clear, refer to "Troubleshooting Table" on
Figure 20 Battery Connections
!
!
MS
44-
batca
bl
e.cdr
Battery Interconnect Wire
Содержание PDRP-1002 Series
Страница 32: ...2 Installation Power Up Procedure 32 PDRP 1002 Instruction Manual PN 51135 B0 04 06 01 Notes...
Страница 38: ...3 System Operation System Events 38 PDRP 1002 Instruction Manual PN 51135 B0 04 06 01 Notes...
Страница 58: ...58 PDRP 1002 Instruction Manual PN 51135 B0 04 06 01...
Страница 59: ...PDRP 1002 Instruction Manual PN 51135 B0 04 06 01 59...