自動化產品
/Automation Products
–
70SB Laser Marking Machine Assembly Manual(Discontinued)
Wiring
–
13
7
-
-
15
GND
GND
8
ENC_A-
-
6.5
Controller wiring
From the above, the wiring has been completed from the controller to laser source and galvanometer
and axial direction. After that, you can finish setting up the hardware environment simply by connecting
the controller to the power supply and to the computer via an Internet cable.
If not with a computer for operation, you may directly connect the monitor, keyboard, and mouse, and
directly use the controller for marking.
6.5.1 Power supply wiring
Please use a 15V power supply with a current of about 3A.
Definition of power connector and pin
No.
Pin name
1
+15V
2
GND
3
-15V
4
FG
6.5.2
Foreground
computer wiring (marking with foreground computer)
This controller can directly use the computer to control marking processing, through the Internet
cable connected to this controller's LAN1 Internet hole.
6.5.3
Monitor, keyboard, and mouse wiring (direct use of controller)
This controller can be connected to the monitor, and the interface is VGA 15pin connector. If you
need to operate the marking man-machine page, you can connect the keyboard and mouse via the
USB interface of the controller.
Содержание 70SB
Страница 1: ...70SB Laser Marking Machine Assembly Manual Discontinued 2022 05 05 2021 10 18...
Страница 16: ...Automation Products 70SB Laser Marking Machine Assembly Manual Discontinued System setup 16...
Страница 17: ...Automation Products 70SB Laser Marking Machine Assembly Manual Discontinued System setup 17...
Страница 25: ...Automation Products 70SB Laser Marking Machine Assembly Manual Discontinued Operation of marking 25...