![Symmetricom 5071A Скачать руководство пользователя страница 70](http://html.mh-extra.com/html/symmetricom/5071a/5071a_assembly-and-service-manual_1419613070.webp)
2. Service
Top-Level Diagnostic Tree (Diagnostic Section 1)
54
1.3.5 Cs Oven-Timeout Test
This error occurs because the indicated cesium oven temperature has not
reached the correct value within 45 minutes from power on or an error has
subsequently occurred. This may be due to a failure of the cesium-oven
heater or thermistor, or the associated circuits on A2.
1
Perform the A2 Thermistor and Cesium Oven diagnostic test procedures in
diagnostic section 3 (3.1.2.1.0 and 3.1.4.1.0) of this chapter.
2
Replace A2 and/or A7 as indicated.
3
Reapply power to the instrument and observe the warm up behavior.
QUESTION:
Did the instrument fail in the same manner?
If Yes: The CBT may be defective, contact Symmetricom for assistance.
If No: Continue diagnostic testing.
1.3.6 CBT Background-Signal Warm-Up Errors
These errors occur when the CBT background signal is not within acceptable
limits after warm up. This condition can be caused by a malfunction in the
CBT itself or by various circuits that control it. This procedure checks these
alternatives.
NOTE
The instrument self-tests must pass successfully for the following
procedure to be conclusive.
1
Perform the Electron-Multiplier Supply tests with procedure 3.7.2.1. Replace
A16 if necessary, and re-connect all leads.
2
Perform the Analog-Signal Chain tests 2.2.1.0. Repair as necessary, and re-
connect all cables and assemblies.
3
Retest the instrument by cycling ac power.
QUESTION:
Does the instrument fail to lock-up, then display one of
the same errors?
If Yes: A CBT fault is indicated, contact Symmetricom for further assistance.
If No: Continue the diagnostic procedures.
Содержание 5071A
Страница 2: ......
Страница 40: ...1 Performance Tests Verifying Specifications 5071A Complete Performance Tests 24 ...
Страница 48: ...2 Service Pre Troubleshooting Information 32 Figure 2 1 Instrument Top View ...
Страница 147: ...3 Theory of Operation Functional Block Descriptions 131 Figure 3 2 5071A Overall Block Diagram ...
Страница 148: ...3 Theory of Operation Functional Block Descriptions 132 Figure 3 2 5071A Overall Block Diagram Continued ...
Страница 164: ...3 Theory of Operation Functional Block Descriptions 148 Figure 3 3 A1 Power Supply Distribution Schematic Diagram ...
Страница 166: ...3 Theory of Operation Functional Block Descriptions 150 Figure 3 4 A1 Slot Module Interconnect Diagram ...
Страница 168: ...3 Theory of Operation Functional Block Descriptions 152 Figure 3 5 Power Supply Block Diagram ...
Страница 171: ...3 Theory of Operation Functional Block Descriptions 155 Figure 3 7 Opt 048 A1 Slot Module Interconnect Diagram ...
Страница 172: ...3 Theory of Operation Functional Block Descriptions 156 Figure 3 8 Opt 048 Power Supply Block Diagram ...
Страница 173: ......
Страница 175: ...3 Theory of Operation Functional Block Descriptions 159 Figure 3 9 A1 Component Locator Diagram ...
Страница 194: ...5 Replaceable Parts How To Order A Part 178 ...
Страница 197: ......