4. Replacing Assemblies - Disassembly and Reassembly
To Remove A17 CBT Assembly
171
Operation Verification
1
Be sure the printer/terminal is on and that there will be a hard copy of the
information captured.
2
Connect power to the instrument, noting the time.
3
If the message “
Cs Oven is Up
” does not appear within 25 minutes,
there may be a problem with the connections to the A2 CBT Controller
assembly. Remove all power, disconnect the internal-standby battery,
and re-check your work.
4
When the message “
Operating Normally
” appears, the instrument is
operating. No further adjustments are needed.
Содержание 5071A
Страница 2: ......
Страница 40: ...1 Performance Tests Verifying Specifications 5071A Complete Performance Tests 24 ...
Страница 48: ...2 Service Pre Troubleshooting Information 32 Figure 2 1 Instrument Top View ...
Страница 147: ...3 Theory of Operation Functional Block Descriptions 131 Figure 3 2 5071A Overall Block Diagram ...
Страница 148: ...3 Theory of Operation Functional Block Descriptions 132 Figure 3 2 5071A Overall Block Diagram Continued ...
Страница 164: ...3 Theory of Operation Functional Block Descriptions 148 Figure 3 3 A1 Power Supply Distribution Schematic Diagram ...
Страница 166: ...3 Theory of Operation Functional Block Descriptions 150 Figure 3 4 A1 Slot Module Interconnect Diagram ...
Страница 168: ...3 Theory of Operation Functional Block Descriptions 152 Figure 3 5 Power Supply Block Diagram ...
Страница 171: ...3 Theory of Operation Functional Block Descriptions 155 Figure 3 7 Opt 048 A1 Slot Module Interconnect Diagram ...
Страница 172: ...3 Theory of Operation Functional Block Descriptions 156 Figure 3 8 Opt 048 Power Supply Block Diagram ...
Страница 173: ......
Страница 175: ...3 Theory of Operation Functional Block Descriptions 159 Figure 3 9 A1 Component Locator Diagram ...
Страница 194: ...5 Replaceable Parts How To Order A Part 178 ...
Страница 197: ......