![Swann AMI Codes-II CC Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/swann/ami-codes-ii-cc/ami-codes-ii-cc_operators-manual_1411949038.webp)
36
A-96.250.581 / 220616
AMI Codes-II CC
Instrument Setup
4.
Instrument Setup
After installation according to checklist proceed as following:
4.1.
Prepare Reagents
1
Prepare reagents. See
Refill or replace Reagents, p. 46
2
Insert the suction lances combined with level detector into the
containers.
4.2.
Peristaltic Pump
The instrument is delivered with opened occlusion frames.
1
Activate the peristaltic pump tubes by closing the occlusion
frame [B].
A
B
C
D
Turn to lock
Occlusion frame
Rotor
Pump tube
A
B
D
C