3-74 ENGINE
• Install the dowel pins.
• Install the camshaft holders and cam chain guide.
• Arrange the camshaft holder by hand so that it is positioned at
1 – 2 mm from the cylinder head mating surface.
• Tighten the camshaft holder bolts in ascending order of num-
bers as shown in the illustration.
!
Cam shaft holder bolt
1
: 10 N·m (1.0 kgf-m, 0.7 lb-ft)
Cam shaft holder bolt
2
: 10 N·m (1.0 kgf-m, 0.7 lb-ft)
NOTE:
Install the camshaft holder to the correct positions according to
the identification marks.
Intake camshaft: IN
Exhaust camshaft: EX
• Unlock the cam chain tension adjuster.
CYLINDER HEAD COVER
• Assemble the new gasket to the cylinder head cover.
• Coat the semicircular part of the gasket with sealing agent.
99000-31230: SUZUKI BOND “1216B”
NOTE:
Do not remove the dowel pin at the backside of the cylinder
head cover since it is embedded.
• Install the cylinder head cover.
• Coat the both sides of the gasket washers
3
with engine oil
and tighten the head cover bolts.
!
Cylinder head cover bolt
Light tightening: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Final tightening: 14 N·m (1.4 kgf-m, 10.0 lb-ft)
1216
1216
Содержание AN650 2002
Страница 1: ......
Страница 47: ...PERIODIC MAINTENANCE 2 29 ...
Страница 124: ...ENGINE 3 73 POSITION OF CAMSHAFTS AND SPROCKETS 15 1 1 2 2 3 3 ...
Страница 137: ...CVT 5 3 Remove the CVT mounting bolts Remove the CVT assembly ...
Страница 177: ...6 16 FI SYSTEM CVT SYSTEM E Serial communication G Speed signal Speed sensor H Engine rpm Crankshaft position sensor ...
Страница 425: ...SERVICING INFORMATION 11 21 FUEL TANK MOUNTING ...
Страница 426: ...11 22 SERVICING INFORMATION FUEL TANK MOUNTING Only for E 28 ...
Страница 427: ...SERVICING INFORMATION 11 23 FUEL TANK HOSE ROUTING Clamp Orange Black Gray Black 5 8 mm 5 8 mm 5 mm TPC valve TPC valve ...
Страница 462: ...Prepared by July 2002 Part No 99500 36110 01E Printed in Japan 464 ...
Страница 463: ......