5-4 CVT
CVT ASSEMBLY INSTALLATION
• Remove the valve timing inspection cap
1
.
• Install the special tool to the engine assembly as shown.
• Apply SUZUKI MOLY PASTE to the primary driven gear shaft
and clutch shaft.
[
09920-31050: CVT guide
Y
99000-25140: SUZUKI MOLY PASTE
• Engage the spline and install the CVT assembly by turning
the crankshaft slowly.
• Install the bracket
2
.
• Tighten the CVT mounting bolt to the specified torque.
!
CVT mounting bolt: 50 N·m (5.0 kgf-m, 36.0 lb-ft)
• Install the valve timing inspection cap
3
.
ENGINE INSTALLATION
3-10
Содержание AN650 2002
Страница 1: ......
Страница 47: ...PERIODIC MAINTENANCE 2 29 ...
Страница 124: ...ENGINE 3 73 POSITION OF CAMSHAFTS AND SPROCKETS 15 1 1 2 2 3 3 ...
Страница 137: ...CVT 5 3 Remove the CVT mounting bolts Remove the CVT assembly ...
Страница 177: ...6 16 FI SYSTEM CVT SYSTEM E Serial communication G Speed signal Speed sensor H Engine rpm Crankshaft position sensor ...
Страница 425: ...SERVICING INFORMATION 11 21 FUEL TANK MOUNTING ...
Страница 426: ...11 22 SERVICING INFORMATION FUEL TANK MOUNTING Only for E 28 ...
Страница 427: ...SERVICING INFORMATION 11 23 FUEL TANK HOSE ROUTING Clamp Orange Black Gray Black 5 8 mm 5 8 mm 5 mm TPC valve TPC valve ...
Страница 462: ...Prepared by July 2002 Part No 99500 36110 01E Printed in Japan 464 ...
Страница 463: ......