ENGINE 3-61
CRANK BALANCER SHAFT
• Install the upper crank balancer shaft
1
.
• Install the lower crank balancer
2
, oil pump drive gear
3
and
oil pump drive chain
4
.
• Engage the drive chain to the oil pump gear and install the oil
pump gear by aligning the groove and pin.
• Install the circlip
5
.
DRIVESHAFT
• Install the counter drive gear shaft
6
from the outside, install
the counter drive gear
7
and fit the circlip.
• Install the idle gear
8
, idle shaft
9
and driveshaft assembly
0
.
Align the punched marks in line.
Check that the circlip is positively fitted.
Содержание AN650 2002
Страница 1: ......
Страница 47: ...PERIODIC MAINTENANCE 2 29 ...
Страница 124: ...ENGINE 3 73 POSITION OF CAMSHAFTS AND SPROCKETS 15 1 1 2 2 3 3 ...
Страница 137: ...CVT 5 3 Remove the CVT mounting bolts Remove the CVT assembly ...
Страница 177: ...6 16 FI SYSTEM CVT SYSTEM E Serial communication G Speed signal Speed sensor H Engine rpm Crankshaft position sensor ...
Страница 425: ...SERVICING INFORMATION 11 21 FUEL TANK MOUNTING ...
Страница 426: ...11 22 SERVICING INFORMATION FUEL TANK MOUNTING Only for E 28 ...
Страница 427: ...SERVICING INFORMATION 11 23 FUEL TANK HOSE ROUTING Clamp Orange Black Gray Black 5 8 mm 5 8 mm 5 mm TPC valve TPC valve ...
Страница 462: ...Prepared by July 2002 Part No 99500 36110 01E Printed in Japan 464 ...
Страница 463: ......