User Manual System Commissioning and Application Example
- 79 -
1. Check the field mechanical and electric wiring.
Before power-on, check the peripheral wiring to ensure component and personal safety.
The items to be checked include:
1) Whether the component models are matched
2) Whether the safety circuit is conducted and reliable
3) Whether the door lock circuit is conducted and reliable
4) Whether the shaft is unobstructed, and the car has no passenger and meets the
conditions for safe running
5) Whether the cabinet and traction motor are well grounded
6) Whether the peripheral circuit is correctly wired according to the drawings of the vendor
7) Whether all switches act reliably
8) Whether there is short-circuit to ground by checking the inter-phase resistance of the
main circuit
9) Whether the elevator is set to the inspection state
10) Whether the mechanical installation is complete (otherwise, it will result in equipment
damage and personal injury)
2. Check the encoder.
The pulse signal from the encoder is critical to accurate control of the system. Before
commissioning, check the following items carefully:
1) The encoder is installed reliably with correct wiring. For details on the encoder wiring,
see section 3.7.
2) The signal cable and strong-current circuit of the encoder are laid in different ducts to
prevent interference.
3) The encoder cable is preferably directly connected to the control cabinet. If the cable
is not long enough and an extension cable is required, the extension cable must be
a shielding cable and preferably welded to the original encoder cable by using the
soldering iron.
4) The shielding cable of the encoder cable is grounded on the end connected to the
controller (only one end is grounded to prevent interference).
3. Check the power supply before power-on.
1) The inter-phase voltage of the user power supply is within (380 V
±
15%), and the
unbalance degree does not exceed 3%.
2) The power input voltage between terminals 24V and COM on the MCB is within (24
VDC
±
15%).
3) The total lead-in wire gauge and total switch capacity meet the requirements.
Содержание NICE3000 New
Страница 1: ......
Страница 13: ......
Страница 14: ...1 Safety Information and Precautions ...
Страница 21: ...Safety Information and Precautions NICE3000new User Manual 20 ...
Страница 22: ...2 Product Information ...
Страница 33: ...Product Information NICE3000new User Manual 32 ...
Страница 34: ...3 Mechanical and Electrical Installation ...
Страница 67: ...4 Use of the NICE3000new ...
Страница 79: ...5 System Commissioning and Application Example ...
Страница 105: ...6 Function Code Table ...
Страница 136: ...Function Code Table NICE3000new User Manual 134 ...
Страница 137: ...7 Description of Function Codes ...
Страница 205: ...8 EMC ...
Страница 214: ...EMC NICE3000new User Manual 212 ...
Страница 215: ...9 Troubleshooting ...
Страница 230: ......
Страница 233: ......