background image

4

1

 

Description

The SX2120-SEQ is a 120V 20 amp three-bank AC power sequencer incorporating SurgeX

®

power conditioning and surge protection. The surge protection is rated A-1-1, the highest
standard of the Federal Commercial Item Description for Endurance. The two rack-space steel
enclosure is designed to be installed in a 19 inch equipment rack. A total of fourteen 120V
receptacles are provided on the rear panel, two of which are always on, with the remaining
twelve configured as three sequenced banks of four receptacles, labeled A, B and C.

SurgeX ICE™ Inrush Current Elimination circuitry is incorporated into the SX2120-SEQ. This
eliminates problems associated with inrush currents from large loads such as amplifiers. With
SurgeX ICE™ it is not necessary to take inrush currents into account when designing the AC
power for a system, and special time-delay circuit breakers are not required: you only need to
ensure that the steady-state currents of all products plugged into the SX2120-SEQ are within the
20 Amp rating of the product and within the rating of the AC wiring.

The front panel houses a three-line back-lit LCD display which provides status information in
normal use and allows interaction with menu items during programming. Also on the front panel
are two screwdriver-accessible rotary encoders which are used to step through and select from a
menu of items which determine the operation of the unit. The red push button, when pressed,
causes the unit to power up or power down. This button can be disabled if not required. The red
LED above the button indicates the status of the unit. When the red LED is off the unit is fully
powered down; when it is on the unit is fully powered up; when it is flashing the unit is in the
process of powering up or down.

A built-in AC voltmeter indicates the line voltage on the third line of the LCD display. The
internal voltmeter is a peak reading type which was chosen because most electronic equipment
incorporates a power supply that charges mostly during the AC peaks. Monitoring the peak of
the AC provides a more useful indication of the actual voltage available to the electronic
equipment plugged into the SX2120-SEQ.

The SEQ is microprocessor controlled and designed to be versatile and expandable. Two or more
SEQs can be connected together to provide control and power conditioning for larger systems.
The SEQ can also control other SurgeX products with its auxiliary relay contacts to provide for
expandability. All options are set via the front panel and all connections are made at the rear
panel. An optional password of up to six letters can be entered preventing unauthorized access to
set-up information. All set-up information is stored in a non-volatile memory.

A plug-in Phoenix terminal block on the rear panel accommodates the remote control
connections and also the low-voltage outputs. There are three inputs which control sequencing;
one programmable 12V dc output; and one programmable auxiliary relay providing a pair of
normally-open contacts. The inputs can be controlled by an applied DC voltage from 5V to 30V,
by a contact closure, or by different types of switch; the input selection being made during
programming. The inputs and 12V output are designed to withstand incorrect connections
including polarity reversal and shorts.

Содержание SX2120-SEQ

Страница 1: ...SX2120 SEQ USER MANUAL Software Version 1 1 Three Bank Sequencer With Power Conditioning Surge Protection...

Страница 2: ...CONTROL 10 5 2 OVER RIDE CONTROL 10 5 3 12V DC OUTPUT 11 5 4 AUXILIARY RELAY 11 5 5 FRONT PANEL PUSH BUTTON 12 5 6 OUT OF RANGE AC VOLTAGE SHUT DOWN 12 5 7 SELF TEST FAILURE SHUT DOWN 12 5 8 RESTORE F...

Страница 3: ...3 7 TROUBLESHOOTING 24 8 ERROR CODES 25 9 SPECIFICATIONS 26...

Страница 4: ...ve the button indicates the status of the unit When the red LED is off the unit is fully powered down when it is on the unit is fully powered up when it is flashing the unit is in the process of power...

Страница 5: ...plugging the cord into a 120V ac 20 amp receptacle The SEQ cannot be plugged into a 15 amp receptacle If a 120V 20 amp branch circuit is not available you will need to have one installed by a license...

Страница 6: ...e wire to the up input and the ground or negative wire to common Program the input for 5 30 V dc b Contact Closure The SEQ will power up when the contacts are closed and power down when the contacts a...

Страница 7: ...n one LED is required then use a separate series resistor for each LED In this example four external LEDs could be powered at 10mA each from one SEQ If more than four LEDs are required it will be nece...

Страница 8: ...is section is intended to allow users with a simple straightforward system incorporating a single SX2120 SEQ to get up and running with the minimum of effort If this is not the case then skip this ent...

Страница 9: ...cer and has 21 menu items that control its operation Some menu items allow predetermined options to be selected and others allow time delays or voltage limits to be adjusted All adjustments are made v...

Страница 10: ...C powering off 5 2 Over Ride Control The SX2120 SEQ has an optional over ride and there are four menu items that control this function If you do not require an over ride you can skip the next four me...

Страница 11: ...t The aux relay can be used to provide feedback to a central controller to control another power distribution product or for controlling another SEQ when two or more are ganged or cascaded together Pl...

Страница 12: ...Fr Panel Button Select Enable for normal operation Delay to operate only after a one second delay and Disable to prevent operation from the front panel 5 6 Out of Range AC Voltage Shut Down The SX212...

Страница 13: ...uthorized access to the programming mode From one to six letters A through Z can be used as a password It is important to remember the password because once it has been set you cannot get into the pro...

Страница 14: ...ted in parallel so that the SEQ can be controlled from multiple locations A single push switch would cause the unit to power up on the first press and then power down on the second press A dual moment...

Страница 15: ...that can be used for fire safety and other applications where the power must be held on or forced off The over ride function is programmable so that it can be set to either force the unit off or forc...

Страница 16: ...ost of the information necessary to install and set up a single unit system can be found in sections 3 2 and 6 1 Figure 1 shows a single unit system controlled by momentary switches at three different...

Страница 17: ...then 5 seconds later bank C turns off In another example if the SX1120 RT should turn on first and off last the programming would be as follows Delay A On 5 Delay A Off 5 Aux Sync A Aux Delay On 0 Aux...

Страница 18: ...unit as well as control from each unit to the next unit The 12V dc output terminal 4 is used as the feedback source and the over ride input terminal 3 is used as the feedback input Figure 5 shows how...

Страница 19: ...SEQ Single Unit System Controlled by Momentary Switches Location 3 Location 2 Location 1 Mixer Signal Processing Amplifier Use an LED and 1K W resistor at each location Program Up Down Inputs One Mom...

Страница 20: ...5 6 7 SX2120 SEQ Mixer Signal Processing Amplifier Single Unit System Controlled by Central Controller Program Up Down Inputs Latching Aux Sync Confirm Confirmation Feedback Controller Low Voltage Con...

Страница 21: ...5 6 7 SX2120 SEQ A On Switched 1 2 3 4 5 6 7 SX1120 RT LED and 1K 1 4W Resistor Confirmation If Required Program Up Down Inputs One Mom 12v dc Output LED Aux Sync A B or C Aux Delay On Set as Needed...

Страница 22: ...1 2 3 4 5 6 7 SX2120 SEQ A ON C B A 1 2 3 4 5 6 7 SX2120 SEQ Program Up Down Inputs One Mom 12V dc Output LED Aux Sync Gang Confirmation If Required Program Up Down Inputs Latching Aux Sync Gang Progr...

Страница 23: ...n If Required LED and 1K 1 4W Resistor Program Up Down Inputs One Mom Over Ride Input 5 30 Vdc Over Ride Func Master 12V dc Output LED Aux Sync Cascade Program Up Down Inputs Latching Over Ride Input...

Страница 24: ...ion If you have performed initial checks as above and the unit will still not power up it could be because the down input terminal 2 is being held active all the time Remove the terminal block from th...

Страница 25: ...05 The calibration of the AC voltmeter is no longer accurate The unit is otherwise fully operational Call the factory for assistance Error 15 There is a checksum error in the non volatile memory This...

Страница 26: ...ad 3dB 5KHz 26dB 100KHz 38 dB 300KHz 50dB 5MHz 50dB 30MHz Let Through Slew Rate 28V us within the AC power wave envelope less than 10V us outside the power wave envelope Maximum Applied Surge Voltage...