select C as the Aux Sync and set this delay time to be longer than the
delay that you set for Main Bank C On.

Aux Delay Off

Set the delay time in seconds for the auxiliary relay opening. This
delay time begins with the same internal trigger as the bank selected
in Aux Sync. For example, if you wanted a forth bank to power on
first and off last, you should select A as the Aux Sync and set this
delay time to be longer than the delay that you set for Main Bank A
Off; or if you wanted a forth bank to power on last and off first, you
should select C as the Aux Sync and set this delay time to be shorter
than the delay that you set for Main Bank C Off (the Aux Delay Off
can be set to zero in this case).

5.5

 

Front Panel Push Button

The front panel push button allows the unit to be powered up or powered down from the front
panel. There is one menu item associated with the push button which allows it to be disabled or
to operate only after a one second delay. The delay option prevents the unit inadvertently
powering on or off if the push button is accidentally touched. Note that the push button cannot be
used in conjunction with applied voltage or latching type remote control inputs.

Fr. Panel Button

Select “Enable” for normal operation, “Delay” to operate only after a
one-second delay, and “Disable” to prevent operation from the front
panel.

5.6

 

Out-of-Range AC Voltage Shut Down

The SX2120-SEQ has built-in line voltage monitoring and out-of-range shut down. The default
limits are 90V at the low end and 150V at the high end, and the shut down sequence begins if the
line voltage remains outside the set limits for 2 seconds or more. These limits are adjusted by
using two menu items, with the low limit adjustable from 90V to 110V and the high limit
adjustable from 130V to 150V. If the unit has shut down due to an out-of-range line voltage and
the line voltage subsequently returns to normal, the power up sequence will only resume if the
Power Fail Restore option (section 5.8) has been set to “Enable”.

Low-V Shut Down

Set the low voltage shut down limit from 90V to 110V

High-V Shut Down

Set the high voltage shut down limit from 130V to 150V

5.7

 

Self-Test Failure Shut Down

The SX2120-SEQ circuitry has integral self-monitoring which tells the microprocessor that the
surge protection is on-line and operating within specification. This menu item allows an option
to be selected so that the unit will begin the power down sequence should the self-test ever fail.

Self-Test Sh Dwn

Select “Disable” if you do not want the shut down feature and
“Enable” if you do want this feature.

Содержание SX2120-SEQ

Страница 1: ...SX2120 SEQ USER MANUAL Software Version 1 1 Three Bank Sequencer With Power Conditioning Surge Protection...

Страница 2: ...CONTROL 10 5 2 OVER RIDE CONTROL 10 5 3 12V DC OUTPUT 11 5 4 AUXILIARY RELAY 11 5 5 FRONT PANEL PUSH BUTTON 12 5 6 OUT OF RANGE AC VOLTAGE SHUT DOWN 12 5 7 SELF TEST FAILURE SHUT DOWN 12 5 8 RESTORE F...

Страница 3: ...3 7 TROUBLESHOOTING 24 8 ERROR CODES 25 9 SPECIFICATIONS 26...

Страница 4: ...ve the button indicates the status of the unit When the red LED is off the unit is fully powered down when it is on the unit is fully powered up when it is flashing the unit is in the process of power...

Страница 5: ...plugging the cord into a 120V ac 20 amp receptacle The SEQ cannot be plugged into a 15 amp receptacle If a 120V 20 amp branch circuit is not available you will need to have one installed by a license...

Страница 6: ...e wire to the up input and the ground or negative wire to common Program the input for 5 30 V dc b Contact Closure The SEQ will power up when the contacts are closed and power down when the contacts a...

Страница 7: ...n one LED is required then use a separate series resistor for each LED In this example four external LEDs could be powered at 10mA each from one SEQ If more than four LEDs are required it will be nece...

Страница 8: ...is section is intended to allow users with a simple straightforward system incorporating a single SX2120 SEQ to get up and running with the minimum of effort If this is not the case then skip this ent...

Страница 9: ...cer and has 21 menu items that control its operation Some menu items allow predetermined options to be selected and others allow time delays or voltage limits to be adjusted All adjustments are made v...

Страница 10: ...C powering off 5 2 Over Ride Control The SX2120 SEQ has an optional over ride and there are four menu items that control this function If you do not require an over ride you can skip the next four me...

Страница 11: ...t The aux relay can be used to provide feedback to a central controller to control another power distribution product or for controlling another SEQ when two or more are ganged or cascaded together Pl...

Страница 12: ...Fr Panel Button Select Enable for normal operation Delay to operate only after a one second delay and Disable to prevent operation from the front panel 5 6 Out of Range AC Voltage Shut Down The SX212...

Страница 13: ...uthorized access to the programming mode From one to six letters A through Z can be used as a password It is important to remember the password because once it has been set you cannot get into the pro...

Страница 14: ...ted in parallel so that the SEQ can be controlled from multiple locations A single push switch would cause the unit to power up on the first press and then power down on the second press A dual moment...

Страница 15: ...that can be used for fire safety and other applications where the power must be held on or forced off The over ride function is programmable so that it can be set to either force the unit off or forc...

Страница 16: ...ost of the information necessary to install and set up a single unit system can be found in sections 3 2 and 6 1 Figure 1 shows a single unit system controlled by momentary switches at three different...

Страница 17: ...then 5 seconds later bank C turns off In another example if the SX1120 RT should turn on first and off last the programming would be as follows Delay A On 5 Delay A Off 5 Aux Sync A Aux Delay On 0 Aux...

Страница 18: ...unit as well as control from each unit to the next unit The 12V dc output terminal 4 is used as the feedback source and the over ride input terminal 3 is used as the feedback input Figure 5 shows how...

Страница 19: ...SEQ Single Unit System Controlled by Momentary Switches Location 3 Location 2 Location 1 Mixer Signal Processing Amplifier Use an LED and 1K W resistor at each location Program Up Down Inputs One Mom...

Страница 20: ...5 6 7 SX2120 SEQ Mixer Signal Processing Amplifier Single Unit System Controlled by Central Controller Program Up Down Inputs Latching Aux Sync Confirm Confirmation Feedback Controller Low Voltage Con...

Страница 21: ...5 6 7 SX2120 SEQ A On Switched 1 2 3 4 5 6 7 SX1120 RT LED and 1K 1 4W Resistor Confirmation If Required Program Up Down Inputs One Mom 12v dc Output LED Aux Sync A B or C Aux Delay On Set as Needed...

Страница 22: ...1 2 3 4 5 6 7 SX2120 SEQ A ON C B A 1 2 3 4 5 6 7 SX2120 SEQ Program Up Down Inputs One Mom 12V dc Output LED Aux Sync Gang Confirmation If Required Program Up Down Inputs Latching Aux Sync Gang Progr...

Страница 23: ...n If Required LED and 1K 1 4W Resistor Program Up Down Inputs One Mom Over Ride Input 5 30 Vdc Over Ride Func Master 12V dc Output LED Aux Sync Cascade Program Up Down Inputs Latching Over Ride Input...

Страница 24: ...ion If you have performed initial checks as above and the unit will still not power up it could be because the down input terminal 2 is being held active all the time Remove the terminal block from th...

Страница 25: ...05 The calibration of the AC voltmeter is no longer accurate The unit is otherwise fully operational Call the factory for assistance Error 15 There is a checksum error in the non volatile memory This...

Страница 26: ...ad 3dB 5KHz 26dB 100KHz 38 dB 300KHz 50dB 5MHz 50dB 30MHz Let Through Slew Rate 28V us within the AC power wave envelope less than 10V us outside the power wave envelope Maximum Applied Surge Voltage...

Отзывы: