Chapter 2: Server Installation
2-3
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating
temperature of the rack environment may be greater than the ambient
temperature of the room. Therefore, consideration should be given to
installing the equipment in an environment compatible with the
manufacturer’s maximum rated ambient temperature (Tmra).
Reduced Airflow
Equipment should be mounted into a rack so that the amount of airflow
required for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition
does not arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power
supply circuitry and the effect that any possible overloading of circuits might
have on overcurrent protection and power supply wiring. Appropriate consid-
eration of equipment nameplate ratings should be used when addressing this
concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack
itself should be grounded. Particular attention should be given to power
supply connections other than the direct connections to the branch circuit
(i.e. the use of power strips, etc.).
Содержание SuperServer 5014C-M8
Страница 1: ...SUPER SUPERSERVER 5014C M8 USER S MANUAL Revision 1 0...
Страница 5: ...v Preface Notes...
Страница 10: ...x Notes SUPERSERVER 5014C M8 User s Manual...
Страница 18: ...1 8 SUPERSERVER 5014C M8 User s Manual Notes...
Страница 27: ...Chapter 2 Server Installation 2 9 Figure 2 4 Accessing the Inside of the SuperServer 5014C M8...
Страница 32: ...3 4 SUPERSERVER 5014C M8 User s Manual Notes...
Страница 66: ...6 8 SUPERSERVER 5014C M8 User s Manual Notes...
Страница 88: ...A 2 SUPERSERVER 5014C M8 User s Manual Notes...
Страница 94: ...B 6 SUPERSERVER 5014C M8 User s Manual Notes...