Chapter 2: Server Installation
2-1
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your SuperServer 1026T-
URF/1026T-UF up and running. Following these steps in the order given should
enable you to have the system operational within a minimum amount of time.
This quick setup assumes that server system has come to you with the proces-
sors and memory preinstalled. If your system is not already fully integrated with a
serverboard, processors, system memory etc., please turn to the chapter or section
noted in each step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the SuperServer 1026T-URF/1026T-UF was shipped
in and note if it was damaged in any way. If the server itself shows damage you
should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the server. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fi elds are generated. You will also need
it placed near a grounded power outlet. Read the Rack and Server Precautions in
the next section.
2-3 Preparing for Setup
The box the SuperServer 1026T-URF/1026T-UF was shipped in should include two
sets of rail assemblies, two rail mounting brackets and the mounting screws you
will need to install the system into the rack. Follow the steps in the order given to
complete the installation process in a minimum amount of time. Please read this
section in its entirety before you begin the installation procedure outlined in the
sections that follow.
Choosing a Setup Location
•
Leave enough clearance in front of the rack to enable you to open the front door
completely (~25 inches) and approximately 30 inches of clearance in the back
of the rack to allow for suffi cient airfl ow and ease in servicing.This product is for
Содержание SUPERSERVER 1026T-UF
Страница 1: ...SUPERSERVER 1026T URF SUPERSERVER 1026T UF SUPER USER S MANUAL 1 0b...
Страница 5: ...v Preface Notes...
Страница 21: ...Chapter 2 Server Installation 2 7 SCALE 0 380 Figure 2 4 Installing the Outer Rails to the Rack 2 3 3...
Страница 24: ...2 10 SUPERSERVER 1026T URF 1026T UF User s Manual Figure 2 6 Installing the Server into a Telco Rack...
Страница 50: ...4 20 SUPERSERVER 1026T URF 1026T UF User s Manual Notes...
Страница 86: ...6 10 SUPERSERVER 1026T URF 1026T UF Manual Notes...
Страница 112: ...A 2 SUPERSERVER 1026T URF 1026T UF User s Manual Notes...