background image

Field Service Documentation

1

Snap Server 410

Copyright © 2009,  Overland Storage, Inc. All rights reserved. Information in this document is subject to change without notice and does 
not represent a commitment on the part of Overland Storage or any of its subsidiaries.

Installing the Snap Server in a Rack

The Snap Server 410 can be mounted in a four-post, EIA-compliant rack, or a two-

post telco-style rack.
The Snap Server ships with two L-brackets to attach to the chassis and a packet of 

screws for mounting the brackets to the chassis and to the rack. The brackets are not 

universal. They are stamped Left and Right and must be mounted correctly. 

Rack Mount Kit Inventory

Before you begin, make sure you have the following items from the package 

containing the rack mounting kit:
• Two (1 left and 1 right) L-brackets (ears)
• Six (6) rack ear screws to attach the brackets to the chassis
• Four (4) rack mounting screws to attach the brackets to the rack posts
• A Phillips screwdriver

Installing the Server in a Rack With the L-Shaped Brackets

Caution  

The chassis weighs approximately 26 pounds. Be sure to handle it 

carefully.

1

Attach the brackets to the chassis, using the 6 screws provided.

You can attach the brackets to the front of the chassis (as shown in the illustration 

below). Or you can attach the brackets farther back, so the ears are in the middle 

of the chassis.

Отзывы: