![Supermicro SuperBlade SBM-GEM-X2C+ Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/supermicro/superblade-sbm-gem-x2c/superblade-sbm-gem-x2c_user-manual_1404297079.webp)
4-9
Chapter 4: InfiniBand Modules
Installing the Module
1.
Remove the dummy cover from the bay you want to place the module in.
2.
Place the module's release handle in the open position.
3.
Slide the module into the module bay until it stops.
4.
Push the release handle to the closed position.
After the module has been installed and the handle locked, it will power on after a short
delay and a POST test will run to verify it is working properly.
Removing the Module
1.
Pull out the release handle to the open position.
2.
Pull the module out of the bay.
3.
Replace immediately with another module or with a dummy module cover to
maintain airflow integrity.
Installing/Removing the InfiniBand Pass-Through Module
Before installing the InfiniBand pass-through module make sure the cover to the module
has been installed before proceeding. Refer to the anti-static precautions described in
.
The InifiniBand pass-through module must be installed into a triple-wide bay. For
instructions on how to create a triple-wide bay, see
.
Assuming that you have already created a triple-wide bay out of three single-wide bays,
continue with the steps below.
Installing the Module
1.
Remove the dummy cover from the bay you want to place the module in.
2.
Place the module's release handle in the open position.
3.
Slide the module into the module bay until it stops.
4.
Push the release handle to the closed position.
Removing the Module
1.
Pull out the release handle to the open position.
2.
Pull the module out of the bay.
3.
Replace immediately with another module or with a dummy module cover to
maintain airflow integrity.
NOTE:
The 10GbE Pass-through module (SBM-XEM-002/M) also requires the
same double-wide bay as the InfiniBand switch module and may be installed
instead of the InfiniBand switch module in your blade enclosure system. Use
the same instructions below for installing either the pass-through module or the
InfiniBand switch module.
Содержание SuperBlade SBM-GEM-X2C+
Страница 4: ...Superblade Network Modules User s Manual iv Notes...
Страница 16: ...Superblade Network Modules User s Manual xvi Notes...
Страница 24: ...Superblade Network Modules User s Manual xxiv Notes...
Страница 31: ...xxxi...
Страница 32: ...Superblade Network Modules User s Manual xxxii Notes...
Страница 52: ...SBI 7127R SH Blade Module User s Manual 2 18 Notes...
Страница 70: ...Superblade Network Modules User s Manual 3 18 Notes...
Страница 125: ...6 29 Chapter 6 1 Gb Ethernet Switch Firmware Figure 6 21 IGMP Snooping Screen...
Страница 133: ...7 5 Chapter 7 Layer 2 3 Ethernet Switch Firmware Figure 7 3 SBM GEM X2C Home Page Figure 7 4 SBM XEM X10SM Home Page...
Страница 134: ...Superblade Network Modules User s Manual 7 6 Figure 7 5 SSE G24 TG4 Home Page Figure 7 6 SSE G48 TG4 Home Page...
Страница 378: ...Superblade Network Modules User s Manual 7 250 Notes...
Страница 390: ...Superblade Network Modules User s Manual A 12 Figure A 10 Card Installation Figure A 11 Installation Complete...
Страница 396: ...Superblade Network Modules User s Manual B 6 Notes...
Страница 402: ...Superblade Network Modules User s Manual C 6 Notes...
Страница 404: ...Superblade Network Modules User s Manual...