NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
11
PRE-INSTALLATION STEPS
The appliance is shipped with all gas controls
and components installed and pre-wired.
Before installing the appliance, follow these steps:
1. Remove the shipping carton.
2. Remove the shipping pad, exposing the
barrier and front glass door.
Barrier (see Notice, Page 40)
This fireplace comes with a barrier to reduce the
likelihood of burns from touching hot glass. If
the barrier is damaged, the fireplace should be
turned off immediately and the fireplace must
not be operated until a new, approved factory
barrier for this unit is installed.
To remove barrier follow these steps.
A. Lift barrier up by the frame at the top.
B. Remove lower filler piece by pulling down
off of the barrier.
C. Lower barrier and push barrier to left to
release right side.
D. Pull the right side out of fireplace.
E. Remove barrier.
3. Using a Phillips screwdriver, unfasten the two
(2) screws located at the top of the glass frame
(see
Figure 39
on
Page 26
).
Tilt the top of the
glass frame away from the unit. Lift it carefully
off the bottom door track and set the door aside,
protecting it from inadvertent damage.
4. Remove the embers and volcanic stone
from the control compartment (Traditional
models).
DETAILED INSTALLATION STEPS
Step 1. FRAMING
Frame these appliances as illustrated in
Figure
8 on Page 12
,
unless the appliance is to be
installed in a corner. See
Figure 9 on Page 13
for corner framing installations. All framing
details must allow for a minimum clearance
to combustible framing members as shown in
Table 5 on Page 10
.
If the appliance is to be elevated above floor
level, a solid continuous platform must be
constructed below the appliance.
Headers may be in direct contact with the ap-
pliance top spacers but must not be supported
by them or notched to fit around them.
The fireplace should be secured to the side fram-
ing members using the unit nailing flanges - one
top and bottom on each side of the fireplace front
(see
Figure 7
)
.
Use 8d nails or their equivalent.
TYPICAL INSTALLATION SEQUENCE
The typical sequence of installation is outlined
below. However, each installation is unique and
may result in variations to the steps described.
See the page numbers references in the follow-
ing steps for detailed procedures.
Step 1.
(
Page 11
)
Construct the appliance
framing. Position the appliance within
the framing and secure with nailing
brackets.
Step 2.
(
Page 13
)
Route gas supply line to the
right side.
Step 3.
(
Page 14
)
Install the vent system and
exterior termination.
Step 4.
(
Page 20
)
Field Wiring
Connect 120 VAC electrical power to
the appliance receptacle.
Step 5.
(
Page 22
)
Remove glass door assem-
bly.
Step 6.
(
Page 23
)
Make connection to gas
supply.
Step 7.
(
Page 23
)
Install firebox liner kit
(Traditional models).
Step 8.
(
Page 23
)
Verify appliance operation.
Step 9.
(
Page 24
)
Install volcanic stone,
glowing embers, and logs (Traditional
models).
Step 10.
(
Page 26
)
Install glass door assembly.
Step 11.
(
Page 26
)
Adjust burner to ensure
proper flame appearance.
Step 12.
(
Page 29
)
Attach Safety-in-Operation
Warnings.
Unit Being Secured by Its Nailing
Flanges to the Framing
Note: The nailing flanges, combustible members
and screw heads located in areas directly adjacent
to the nailing flanges, are EXEMPT from the 1/2”.
clearance to combustible requirements for the
firebox outer wrapper. Combustible framing may be
in direct contact with the nailing flanges and may
be located closer than 1/2” from screw heads and
the firebox wrapper in areas adjacent to the nailing
flanges. Frame the opening to the exact dimensions
specified in the framing details of this manual.
Use Top Flange For
1/2” Thick Drywall
Use Bottom Flange For
5/8” Thick Drywall
Front Of
Fireplace
Use Center Flange
For Flush Mount
Left Side Front Corner of Fireplace Shown
(Right Side Requirements the Same)
Unit Being Secured By Its Nailing Flanges
To The Framing
NOTE: The nailing flanges, combustible members
and screw heads located in areas directly adja-
cent to the nailing flanges, are EXEMPT from the
1/2" clearance to combustible requirements for
the firebox outer wrapper. Combustible framing
may be in direct contact with the nailing flanges
and may be located closer than 1/2" from screw
heads and the firebox wrapper in areas adjacent
to the nailing flanges. Frame the opening to
the exact dimensions specified in the framing
details of this manual.
Left Side Front Corner of Fireplace Shown
(Right Side Requirements the Same).
Figure 7 - Unit Secured by Nailing
Flanges to the Framing
INNOVATIVE HEARTH PRODUCTS • POWER VENT DV GAS FIREPLACES (DRT6340TYN AND DRT6345TYN) • INSTALLATION INSTRUCTIONS
f i r e - p a r t s . c o m