8
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
VENT TERMINATION CLEARANCES
These instructions should be used as a guideline and do not supersede local codes in any way.
Install venting according to local codes, these instructions, and the current (USA) National Fuel
Gas Code ANSI-Z223.1 / NFPA 54, or (Canada) CAN/CGA-B149.1 standards.
Horizontal Vent Termination Clearances
The horizontal vent termination must have a minimum of 3" (77 mm) clearance to any overhead
combustible projection of 2-1/2" (64 mm) or less (see
Figure 3
)
.
For projections exceeding 2-1/2"
(64 mm), see
Figure 3
. For additional vent location restrictions refer to
Figure 4 on Page 9
.
LOCATION
In selecting the location, the aesthetic and
functional use of the appliance are primary
concerns. However, vent system routing to
the exterior and access to the fuel supply are
also important.
Due to high temperatures, the appliance
should be located out of traffic and away from
furniture and draperies (Figure 2).
En raison des températures élevées,
l’appareil devrait être installé dans un
endroit où il y a peu de circulation et loin
du mobilier et des tentures (Figure 2).
The location should also be free of electrical,
plumbing or other heating/air conditioning
ducting.
Be aware that this is a heat producing ap-
pliance. Objects placed above the unit are
exposed to elevated temperatures.
Do not insulate the space between the appli-
ance and the area above it
.
The appliance must be mounted on a fully
supported base extending the full width and
depth of the unit. The appliance may be lo-
cated on or near conventional construction
materials. However, if installed on combustible
materials, such as carpeting, vinyl tile, or other
combustible material other than wood flooring,
the appliance shall be installed on a metal or
wood panel extending the full width and depth
of the appliance.
Recessed
Application
Cross Corner
Application
Flat
Application
Flat on W
all
Application
Room Divider
Application
Island
Application
Figure 2 - Typical Installation
Top of Fireplace
Opening
Drywall
Noncombustible
Horizontal
Termination
Fireplace
NOTE: When the unit is installed with
one side flush with a wall, the wall on
the other side of the unit must not extend
beyond the front edge of the unit.
INNOVATIVE HEARTH PRODUCTS • POWER VENT DV GAS FIREPLACES (DRT6340TYN AND DRT6345TYN) • INSTALLATION INSTRUCTIONS
See Figure 19 on Page 19 for the re-
cess allowances, into exterior walls,
of the power vent terminations.
Combustible Projection
2-1/2" or less in length
Combustible Projection
Greater than 2-1/2" in length
Ventilated or
Unventilated Soffit
3".
(77 mm)
24"
(610 mm)
Power Vent Termination
Side Elevation View
Figure 3 - Horizontal Vent Termination Clearances
Combustible
18"
(457 mm)
f i r e - p a r t s . c o m