89
5.5 MACHINE MAINTENANCE
SCHEDULE
5.5.1 Daily Maintenance (Every 8 Hours)
Carry out the following maintenance operation
before starting machine daily (8 hours)
5.5.1.1 Filling grease of work attchment
(1) boom cylinder foot ,1 place.
SWE80 boom cylinder foot ,2 places
(2) boom foot pin ( 2 places)
(3) arm cylinder foot pin (1 place)
(4) boom cylinder piston rod end (1 place)
(5) boom – arm connecting pin ( 1 place)
(6) arm cylinder piston rod end (1 place)
(7) bucket cylinder foot pin (1 place)
(8) arm –link connecting pin( 1 place)
(9) arm – bucket connecting pin( 1 place)
(10) link connecting pin( 1 place)
(11) bucket cylinder rod end.(1 place)
(12) bucket – link connecting pin( 1 place)
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...