![SUNWARD SWE50B Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/sunward/swe50b/swe50b_operation-and-maintenance-manual_1401103064.webp)
57
Proper
amount
Fluid inspection lens is
clear with no bubble
when working, a few
bubbles appear at start
and in 10 seconds after
shut down.
Air outlet is cold,
condenser
inlet
is
very hot, condenser
outlet is hot or warm,
air intake duct is cold
with normal pressure
at both sides.
Slightly
insufficient
A few bubbles appear
during work
Extremely
insufficient
Too
many
bubbles
appear during work
Air outlet is not cold
enough,
condenser
inlet
is
not
hot
enough,
condenser
outlet is like the
environment
temperature,
air
intake duct is warm
and the pressure of
high pressure side is
very low.
Check,
repair and
fill
refrigerant
Almost no
Fluid inspection lens is
clear with no bubble at
start, when working or
shut down.
Air outlet is not cold,
condenser inlet is not
hot, condenser outlet
is like environment
temperature,
air
intake duct is warm
and the side pressure
is low.
No bubble at start and
after shut down, a few
bubbles appear when
working with long
strings of oil dripping
and
oil
stain
sometimes.
Note
:
The above mentioned outcomes all happen on hot days. Owing to the external conditions, etc,
sometimes it’s hard to judge the condition of fluid inspection lens, so pay attention to the high and side
pressure and fluid inspection lens at the same time when filling refrigerant.
(9) Cautions while disassembling the pipeline system
①
.
The joints disassembled from the pipelines must be sealed in time to make the inner system exposed
to air for a short time as possible, avoiding the wet air from entering the system.
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...