![SUNWARD SWE50B Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/sunward/swe50b/swe50b_operation-and-maintenance-manual_1401103042.webp)
35
Before starting engine
(As figure 3.3.9)
(1)
Keep pilot valve control lever locked and keep pilot handle & travel pole neutral.Turn on switch of power,
operator sits in cab.
(2)
Turn key switch to ON position, all indicator lights except engine hour meter and LCD module and
buzzer sounded at the same time, finished self inspection after 2 seconds, the monitor system is on normal
working condition.
Start the engine
a)
Keep pilot valve control lever locked and keep pilot handle & travel pole neutral.
Operator sits on seat.
b) Turn key switch to ON position.
c) Beep horn to warn surrounding people.
d) Place accelerograph pull-rod to the place which is higher than lowest idle speed.
e) Start engine by turning key switch clockwise to START position, release key, the switch
will return ON position.
【
Important
】
In order to avoid damage of starter, never operate motor starter for
5
seconds or more
every time. If the engine can’t start, turn the key switch to OFF position and wait at least 30 seconds, then try
again. After wrong start, the engine should be stopped completely, then you can turn key switch, otherwise it
may damage starter (As figure 3.3.7).
Start engine in cold weather
(1) Turn the ignition key to ON position.
(2) Turn the key to START position and hold for few seconds to lubricate the hydraulic pump before enging
starts.
(3) Turn the key anticlockwise to HEAT position, the indicator light will on after 30 seconds which means the
preheating is finished.
(4) When the preheating indicator light is on, start the engine as above mentioned methods.
Figure 3.3.9
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...