39
Travel brake
Release travel pedal or travel handle, it will return to natural position automatically, the machine stops
traveling.
Key points of travelling
(1)
Arm and bucket cylinder must be extended completely
to place the working device on minimum radius position, the
bucket will be about 0.5m to the ground.
(2)
Lift dozer blade to its zenith.
(3)
Choose plane road to travel as much as possible. It
should travel straight when traveling or turning, and also turn
large bend, avoid turing blind bend. When turn in one point at
confined area, it should operate gently.
(4)
When travel at badlands or uneven carpolite road, it
should reduce engine rev and travel at about 1.5km/h to reduce
the vibration.
(5)
Avoid back traveling to prevent crawler parts damaging
prematurely.
(6)
If the excavator can’t travel for getting into miriness,
you can extend arm and place bucket to ground (as figure) to lift
one side of crawler, then turn the lifted crawler to clean out the
bedload. In order to reduce the force enduring of boom and arm,
the angle between boom and arm should be in the range of
90
--110
(As figure 3.4.7)
(7)
When the machine gets into wallow or passing
raceway, you can use arm and boom to help the machine
passing (As figure 3.4.8)
(8)
Extend arm when travel on slope, lower bucket
to 0.5m to ground (As figure 3.4.9)Travel downgrade
slowly by controlling engine accelerograph and adjusting
pilot valve imperceptibly to prevent sliding and accident.
If the machine slides on slope, put down bucket for brake
purpose. Pay special attention when the machine climbs
slope, if the engine stops, it should put down bucket to
Figure 3.4.7
90
0
~
110
0
Figure 3.4.8
Figure 3.4.6
Figure 3.4.9
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...