Pay special attention to the first 50 hours
running until be familiar with the sound
and feelings of new machine.
3. MACHINE OPERATION
3.1 MACHINE WORKING ENVIRONMENT
Machine adjustment is not needed below the altitude of 2300m and temperature above -30
℃
. And you should
fully preheat machine before starting it. You can run it all day even on rainy or snowy days but have to obey
corresponding safe operation instructions.
3.2 RUNNING-IN OPERATION
(1)
Watch engine running carefully
Important:
Take care of machine in initial 50 hours, till you fully familiar with the sound and feeling of machine.
Limit the engine power within the range of 80% full load and operate the excavator.
Avoid engine exceeding idle.
Check the indicator light and display usually during running.
(2)
Every 8 hours operation or everyday
Carry out the 8 hours operation or everyday maintenance. (refer to maintenance guide.....eight hours)
Pay attention to the liquids leakage.
In the first 100 hours or working in mud, lubricate the pivot of working instrument after every 8 hours
operation.
(3)
After first 50 hours operation
Carry out every 50 hours maintenance. (refer to maintenance guide.....fifty hours)
The manual only applies to normal working conditions, when the machine works in
other potentially dangerous conditions, such as conditions with inflammable,
explosive materials, dust and poisonous chemical materials, you should obey
corresponding safe operation instructions and regulations.
When the machine is used with other purposes not in this manual, you have to get
the consent of Sunward or its agents and obey relative regulations in the place
where the machine is used.
Содержание SWE50B
Страница 24: ...17 2 1 CAB As figure 2 1 shown Figure 2 1...
Страница 38: ...31 No step on label...
Страница 92: ...85 5 4 11 Hose...
Страница 119: ...112 Engine Fault Diagnosed Code...
Страница 120: ...113...
Страница 121: ...114...
Страница 129: ...122 6 1 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 131: ...124 6 1 6 Hydraulic Diagram...
Страница 136: ...129 6 2 4 Circuit Diagram 2R 2RL 2B FUSE 100 F 50V 100 F 50V motor sw motor relay FUSE B G R...
Страница 138: ...131 6 2 6 Hydraulic Diagram...
Страница 143: ...136 6 3 4 Circuit Diagram...
Страница 145: ...138 6 3 6 Hydraulic Diagram...
Страница 150: ...143 6 4 4 Circuit Diagram...
Страница 152: ...145 6 4 6 Hydraulic Diagram...
Страница 157: ...150 6 5 4 Circuit Diagram...
Страница 159: ...152 6 5 6 Hydraulic Diagram 280...
Страница 164: ...157 6 6 4 Circuit Diagram...
Страница 166: ...159 6 6 6 Hydraulic Diagram...
Страница 171: ...164 6 7 4 Circuit Diagram...
Страница 173: ...166 6 7 6 Hydraulic Diagram...
Страница 178: ...171 6 8 4 Circuit diagram...
Страница 185: ...178 6 9 4 Circuit Diagram...
Страница 192: ...185 In order to prevent misoperation please cover the protective lid when there is no need to operate break hammer...