EVERGEN M SERIES USER MANUAL
INSTALLATION
24
Sol by Sunna Design | 990 Biscayne Boulevard, Office 701, Miami, FL 33132, USA | 1.800.959.1329 | [email protected]
5. Direct Arm Installation
1
For systems with a Direct Arm fixture mount, refer to the following instructions.
Use the lighting layout to obtain the recommended height (X) above the ground at which the fixture will be
mounted.
X
X
10mm
.40in
THRU
25mm
1.0in
FIXTURE SIDE ONLY
10mm
.40in
THRU
101.6mm
4.00in
50.8mm
2.00in
FIXTURE
CABLE
HOLE
!
NOTES
1
TYPE YOUR NOTES IN HERE
2
FEEL FREE TO MOVE/RESIZE THIS TABLE
REV ECO #
DESCRIPTION
DATE
DRAWN BY
MATERIAL SEE PART MATERIAL
FINISH
N/A
FINISH
SPEC
N/A
COLOR
N/A
D
C
B
A
A
B
C
D
1
2
3
4
5
6
7
8
8
7
6
5
4
3
2
1
TITLE
B
1:64
-
EVERGEN MANUAL, DIRECT ARM
AND DAVIT ARM INSTALLATION
1 OF 5
82276
SHEET
SIZE
REVISION
SCALE
DRAWING NO
CAD REFERENCE
250 Bay Street
Victoria, BC Canada V9A 3K5
Tel [250] 380-0052
Fax [250] 380-0062
CHANGES SHALL BE INCORPORATED
ELECTRONICALLY BY THE DESIGN AUTHORITY
PDM MAINTAINED DATA
PROPRIETARY
COPYRIGHT © 2012 ALL RIGHTS RESERVED. NO
PART OF THIS
DOCUMENT MAY BE REPRODUCED
STORED IN A
RETRIEVAL SYSTEM, OR
TRANSMITTED IN ANY
FORM
ORIGINALLY DESIGNED BY
ORIGINALLY DRAWN BY
CHECKED BY
DATE
DATE
DATE
Ben Jolie
Ben Jolie
02/03/2017
08/09/2017
UNLESS OTHERWISE SPECIFIED
DO NOT SCALE DRAWING
INTERPRET DIMENSIONS AND TOLERANCES
PER ASME Y14.100-2000
TOLERANCES APPLY AS SHOWN BELOW
DECIMALS SURF FINISH ANGLES
.X
.XX
.XXX
.XXXX
± .1
± .01
± .005
± .0005
63
1
INCHES
THIRD ANGLE PROJECTION
DOC #
DATE
21/12/11
57012
B
DOC REVISION
80871
ALL COMPONENTS AND PROCESSES TO BE ROHS COMPLIANT, CERTIFICATE REQUIRED WITH INITIAL SHIPMENT
2
Once the location, and orientation of the fixture has been established as per the lighting layout, mark the
position on the pole.