50
7.6
LCD Parameter Setting
When the LCD is on, set the display language, date and time, communication
parameters, active power limitation, etc. according to Chapter
in this manual; and view the running information and perform related
operation.
7.7
Completing Commissioning
If all the start-up procedures have been performed, check the operating condition of the
MV Station.
•
Check whether there are anomalies of the module: abnormal noise, overheating,
smoking or unusual odor.
•
Check that the grid-connected voltage, current, and THD of the MV Station are
stable.
•
Check the grounding of the module enclosure.
•
Check the functionality of the LCD display.
•
Record accurately the module operation data during commissioning.
The duration of commissioning depends on the plant scale, plant location, on-site
environmental conditions and so on. Usually, if the in-site condition is good, the
commissioning can last for 1 week, i.e. 168 hours.
The commissioning of the module is completed. Module operates normally.
After successful commissioning, the MV Station will be put into operation.
Local/national standards about the min. electric clearance around the MV
Station should be respected.
MV Station needs no manual control in daily operation. Open the cabinet door
only for maintenance or troubleshooting and by qualified personnel only.
Keep the door closed and locked and store the keys of the door by appointed
personnel during normal operation.
System Manual
Содержание SG4950HV-MV
Страница 2: ......