69
step 5
If Pf is selected, the power factor can be set in the “Run-information” sub-menu;
•
if “Q-limit” is selected, the “Q-limit (%)” can be set in the “Run-information”
sub-menu.
•
if "QU mode" is selected, QU-related parameter can be set on the running parameter
interface, where the parameter name begins with "QU", for example, QU operation
mode.
-- -- E
En
nd
d
Improper parameter configuration may affect the normal operation of the MV
Station!
Only authorized personnel can configure these parameters.
Should any question or doubt occurs, contact Sungrow.
10.5 Low Voltage Ride Through (LVRT)
T
Te
ec
ch
hn
niic
ca
all R
Re
eq
qu
uiirre
em
me
en
nttss ffo
orr C
Co
on
nn
ne
ec
cttiin
ng
g P
Ph
ho
otto
ovvo
olltta
aiic
c P
Po
ow
we
err S
Stta
attiio
on
n tto
o P
Po
ow
we
err
S
Syysstte
em
m requires medium-and-large PV plant should be equipped with Low Voltage
Ride Through (LVRT) ability.
LVRT requires: PV plant can operate normally within certain voltage drop range and
duration when the voltage of the grid-connected point drops due to the power system
failure or disturbance; PV plant can provide the dynamic reactive power support during
the period.
A
Ac
cttiivve
e P
Po
ow
we
err R
Re
ec
co
ovve
erryy
If the power station still connects to the grid during power system failure, the active
power will recover from the moment the fault is removed at the speed of at least 30%
nominal power/second.
D
Dyyn
na
am
miic
c R
Re
ea
ac
cttiivve
e C
Cu
urrrre
en
ntt S
Su
up
pp
po
orrtt
During LVRT, power station should feed reactive current to the power system as per
requirements. For a station whose 500kV or 750kV voltage is stepped up from the
220kV or 330kV voltage and then connects to the power station group, it should feed
reactive current to the grid when a short-circuit occurs and the voltage drops.
Z
Ze
erro
o V
Vo
olltta
ag
ge
e R
Riid
de
e T
Th
hrro
ou
ug
gh
h
When the grid-connection point voltage drops to zero, power station can operation
normally for 0.25 second.
Note: U
T
is the grid-connection point voltage; Upu is the grid-connection point nominal
voltage.