70
ffiig
gu
urre
e 1
10
0--2
2 Lower voltage withstand requirements
Note: T1, T2, U1, and U2 are all settable parameters.
Sungrow’s MV Station meets the abovementioned requirements.
10.6 High Voltage Ride Through (HVRT)
T
Te
ec
ch
hn
niic
ca
all R
Re
eq
qu
uiirre
em
me
en
nttss ffo
orr C
Co
on
nn
ne
ec
cttiin
ng
g P
Ph
ho
otto
ovvo
olltta
aiic
c P
Po
ow
we
err S
Stta
attiio
on
n tto
o P
Po
ow
we
err
S
Syysstte
em
m requires PV plant should be able to operate as required within certain voltage
range.
G
Grriid
d--c
co
on
nn
ne
ec
cttiio
on
n p
piin
ntt vvo
olltta
ag
ge
e
R
Re
eq
qu
uiirre
em
me
en
nttss
1.1U
pu
<U
T
<1.2U
pu
Operate for at least 10s
1.2U
pu
≤U
T
≤1.3U
pu
Operate for at least 0.5s
Note: U
T
is the grid-connection point voltage;
U
pu
is the grid-connection point nominal voltage.
ffiig
gu
urre
e 1
10
0--3
3 High voltage withstand requirements
Note: T1, T2, U1, and U2 are all settable parameters.
Sungrow’s MV Staion meets the abovementioned requirements.
System Manual
Содержание SG4950HV-MV
Страница 2: ......