According to the cable design of MV Station and for easy electrical connection,
establish cable trenches on bottom of the MV Station, i.e. reserve the cable
trenches inside the foundation and pre-bury the wire pipes.
The material dug out should be cleared immediately.
5.3.3 Recommended Foundation Construction Method
O
Ovve
errvviie
ew
w
This section provides two foundation schemes to choose from. Select the
corresponding fixing method according to the standards and specifications of the
project site to construct the foundation.
F
Fiixxiin
ng
g m
me
etth
ho
od
d
R
Re
effe
erre
en
nc
ce
e
Welding
5.3.3.1 Scheme 1: Fixing by Welding
Welding and fastening
5.3.3.2 Scheme 2: Fixing by Welding and Fastening
5.3.3.1 Scheme 1: Fixing by Welding
The overall diagram is shown in the following figure.
N
No
o..
N
Na
am
me
e
A
Pea gravel ground
B
Foundation
C*
Oil tray
Note: * is optional.
C
Co
on
nssttrru
uc
cttiin
ng
g tth
he
e F
Fo
ou
un
nd
da
attiio
on
n
It is recommended to construct the foundation as the following solution.
N
No
o..
N
Na
am
me
e
D
Embedded channel steel
F
Fiixxiin
ng
g tth
he
e M
MV
V S
Stta
attiio
on
n
Hoisting the MV Station to the desired location and weilded.