SG2K5TL/SG3KTL/SG4KTL-31
User Manual
40
−
DC bus starts to charge and check the state of utility grid;
−
If the conditions are OK, inverter feeds AC power to grid and enters into the
running state.
4. Observe state of LED indicators and LCD screen.
If inverter’s commissioning fails, “FAULT” indicator will be lit. And “
State
” on the LCD
screen will display type of malfunction. In this case malfunction must be removed and
then repeat 1 to 4.
If inverter‘s commissioning succeeds, “RUN” indicator will be lit. “
” on the LCD
screen will display “RUN”.
Содержание SG2K5TL
Страница 2: ......
Страница 6: ......
Страница 10: ...IV...
Страница 16: ...SG2K5TL SG3KTL SG4KTL 31 User Manual 6...
Страница 52: ...SG2K5TL SG3KTL SG4KTL 31 User Manual 42 Press the ribbing Pull outwards Disconnect DC connectors...
Страница 60: ...SG2K5TL SG3KTL SG4KTL 31 User Manual 50 10 3 Overview of Complete LCD Menu Fig 10 1 Menu Tree...
Страница 76: ...66 Temperature Derating Curve 1 0 2 45 60 Pnom P U Ambient temperature C...
Страница 79: ......