18
Sun Datacenter Switch 3456 Installation Guide • December 2008
Receiving Area
This section lists the equipment used in the receiving area or loading dock and the
condition and state of the area.
Equipment
To receive and unpack the Sun Datacenter Switch 3456, the following equipment is
required.
■
Forklift or pallet jack rated for at least 2000 lbs
■
Large flat-blade screwdrivers (one for each person unpacking)
■
Claw hammer (one for each person unpacking)
■
Adjustable wrench (two for each person unpacking)
■
Scissors
■
Gloves (for each person unpacking)
■
Bin for parts collection
Cleanliness
The unpacking area must be clean and uncluttered. Personnel will be working
closely and activity. The personnel must be free to move about without distraction or
the possibility of tripping or slipping.
The task of unpacking produces packing material waste and wood shavings. This
debris should be removed and swept away before the chassis is rolled out.
After rollout, the crate can be reassembled and stored. The unpacking area should be
swept again.
Personnel
This section describes the personnel needed for the installation, what their tasks are,
and their mindset.
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...