Preparing for Installation
This chapter describes tasks to be accomplished before actually installing the Sun
Datacenter Switch 3456. Topics include:
■
“Final Location Checklists” on page 11
■
“Path to Final Location” on page 15
■
■
■
“Installation and Maintenance Tools” on page 21
Final Location Checklists
This section includes a checklist that the installers can use to ensure that they are
ready for installation. This checklist covers power, air conditioning, network cabling,
spacing, loading, and other topics.
Power Checklist
■
____ Are correct power cables used?
■
____ Is power routed through circuit breakers to code?
■
____ Is power conditioned before the chassis?
■
____ Is the power turned off?
■
____ Has a backup solution been implemented?
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...