
Chapter 10
Powering On
91
●
To check the status of the CMCs, type this command:
For example:
Powering On the Sun Datacenter Switch
3456
Powering on the Sun Datacenter Switch 3456 is a sequential process.
▼
To Power On the Sun Datacenter Switch 3456
1. Verify that all installed power supplies have a green Connected LED lit.
If the Connect LED is not lit, or the amber Attention LED is lit, investigate why.
2. Establish a connection to the CMCs.
See
“Working With CMCs” on page 87
3. Verify all installed components are recognized as installed, type:
If an installed component is not recognized, investigate why. See the
Sun
Datacenter Switch 3456 Administration Guide
and
Sun Datacenter Switch 3456 Service
Manual
for further assistance.
4. Power on each power supply, type:
where
slot
is
0
to
15
.
#
clia shmstatus
#
clia shmstatus -v
Pigeon Point Shelf Manager Command Line Interpreter
Host: "Active"
Ready For Operation: Yes
Detailed State Flags: "Shelf FRU Found" "Backup Healthy" "Initial
Update Sent" "RMCP Up"
#
#
showpresent
#
enablepsu
slot
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...