![background image](http://html.mh-extra.com/html/sun-microsystems/datacenter-switch-3456/datacenter-switch-3456_installation-manual_1393060045.webp)
Chapter 5
Unpacking the Chassis
31
a. Loosen the screws that secure the brackets to the chassis.
See
.
b. Raise the brackets all the way.
c. Tighten the screws to secure the brackets to the chassis.
▼
To Roll Out the Chassis
1. Ensure that the floor space up to 5 feet (1.5 m) from the end of the ramp is clear.
2. Prepare the personnel.
■
One person (pusher) will push the chassis off the pallet from the end opposite
the ramps.
■
One person (guider) at the left of the chassis (left side of ramps) will guide the
chassis off the pallet and brake its roll down the ramps.
■
One person (guider) at the right of the chassis (right side of ramps) will guide
the chassis off the pallet and brake its roll down the ramps.
See
.
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...