
100
Sun Datacenter Switch 3456 Installation Guide • December 2008
FIGURE 11-4
Plugging in a IB Cable
a. Visually inspect the cable connector to see whether the shell is not bent and
is parallel to the inner boards.
If the shell is bent or damaged, get a different cable.
b. Ensure that the retraction strap is forward.
c. Orient the cable connector to the line card iPASS connector squarely and
horizontally.
Ensure that the upper shell just touches the underside of the top of the
connector on the line card.
See
.
FIGURE 11-5
Checking the IB Cable Connector
d. Slowly move the connector in.
As you slide the connector in, the top of the shell should scrape against the
underside of the top of the iPASS connector on the line card.
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...