Chapter 6
Installing the Chassis
43
Inspecting the Chassis
The weight of the Sun Datacenter Switch 3456 promotes a susceptibility to vibration
and movement. It is good practice to inspect the chassis as an early part of the
installation process.
▼
To Verify Electrical Leakage
Use a DMM for this verification test.
1. Grasp the release lever of power supply 0 and pull to release the power supply.
See
FIGURE 6-7
Releasing the Power Supply
2. Continue to pull the power supply halfway out, but do not remove it.
3. Repeat from
for all power supplies.
4. Set the DMM for ohms.
If the DMM is not autoranging, set it for the highest resistance.
5. Touch the black probe of the DMM to the chassis ground.
See
Содержание Datacenter Switch 3456
Страница 10: ...x Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 14: ...xiv Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 20: ...6 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 48: ...34 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 49: ...Chapter 5 Unpacking the Chassis 35 ...
Страница 73: ...58 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 87: ...72 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 97: ...82 Sun Datacenter Switch 3456 Installation Guide December 2008 ...
Страница 125: ...110 Sun Datacenter Switch 3456 Installation Guide December 2008 ...