![Sun Microsystems 5500 Скачать руководство пользователя страница 190](http://html1.mh-extra.com/html/sun-microsystems/5500/5500_reference-manual_1392445190.webp)
B-2
Sun Enterprise 6500/5500/4500 Systems Reference Manual • April 1998
5. In the Enterprise 6500 system, empty board slots require load boards (part
number 501-3142) to reduce the possibility of RFI generation. The Enterprise 5500
and 4500 systems use filler panels (part number 540-2592).
B.1.2
Basic Definitions for the Card Cage
When locating a board slot in the 8-slot and 16-slot card cages, remember:
Enterprise card cages feature a centerplane bus. Boards at the front of the
centerplane must be installed component side down, while boards at the back must
be installed component side up. The boards are oriented this way to allow for
minimum signal trace lengths and optimum system performance.
illustrates the logical organization of Enterprise systems.
Slot numbers
Even-numbered slots are at the front of the card cage.
Odd-numbered slots are at the back.
In the front of the card cage, slot 0 is at the top.
At the rear of the card cage, slot 1 is at the top.
The component side of a board is down in the front slots.
The component side is up in the rear slots.
For specific slot numbers, see Appendix B, Section B.2.3 “Enterprise 4500 Standalone Server”
on page B-6.”
Slot functions
All card cage slots are equivalent in the Enterprise 6500, 5500, and 4500 systems. However, it
is suggested that you install I/O+ boards at the back of the cage to simplify the installation of
interface cables. Install CPU/ boards at the front of the cage to leave the rear slots
for I/O+ boards. If all slots are filled on one side of the cage, you can use the other side.
Slot 1 should contain an I/O+ board connected to the boot disk. (This is a suggestion, and not
a requirement.)
Slot 0 should contain a CPU/master board with at least one CPU. The POST diagnostics
display more messages if slot 0 contains a CPU/ board and a CPU. For an
explanation, see the next item, “Master board.”
Master board
The first CPU/ board (in slot 0) functions temporarily as a master board during
some POST tests. There is no master board during normal system operations after the POST
tests have finished.
Содержание 5500
Страница 12: ...xii Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 20: ...xx Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 85: ...Chapter 4 I O Boards and Components 4 27 FIGURE 4 24 Graphics I O Board GBIC Connector Locations GBIC 1 GBIC 0 ...
Страница 89: ...Chapter 4 I O Boards and Components 4 31 FIGURE 4 27 PCI Card Removal Catch mechanism ...
Страница 94: ...4 36 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 128: ...7 14 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 172: ...11 10 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 184: ...12 12 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 208: ...B 20 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 272: ...F 24 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...
Страница 290: ...G 18 Sun Enterprise 6500 5500 4500 Systems Reference Manual April 1998 ...