22/109
8.
Check to ensure that the tension of the netting between the poles is sufficient
(Fig. 7). Check to make sure that the ground clearance – under 25 mm or between 45 and
102 mm – is maintained along the entire stretch of the module (Fig. 7).
Fig. 6. The rust-free poles must be fully inserted into the ground anchors
(The security hooks are on the side facing in the
direction of the pool
)
Fig. 7. The tension of the netting must be adequate, and the ground clearance according to the
regulations
Step B: Installation of the next module
1. Drill the first hole for the 2nd module at least 75 cm away from the final hole of the 1st
module (Fig. 8). Fix the ground anchors (if necessary with mortar) in place.
Fig. 8. Fixing the next module in place in line with the previous one
2. Insert the rust-free rods of the poles into the corresponding anchors (the security hook
must be on the side
facing towards the swimming pool
). If necessary, use a rubber
hammer to fully hammer each pole into its respective anchor.