Read the enclosed safety instructions, appendix 39 230 ..!
Erection instructions
appendix 39 328 ..!
1. Rotofix : Technical data
2. Flexible shaft
3. Start-up procedures:
3.1
Set the operating speed
3.2
Connect the flexible shaft
3.3
Connect toolholders
3.4
Start-up
4. Accessories: FH7, WI7 with 45°, WI7, WIG7
1. Rotofix
F=base plate HM=hanging attachment STM=trolley mounted
Machine elements: See Fig. A
A1 On/Off switch
A3 Speed indicator
A5 Excenter
A2 Retention pin
A4 Speeds
A6 Motor shaft
Technical data
Three-phase motor
Power input / output three - phase
500 / 370
W
Power input / output single - phase
500 / 300
W
Insulation protection class
IP44
Voltage (see spare parts list)
Various
Hand tools with central waterfeed:
45 V
Low voltage ( electr. curr. prot. )
No load speeds
50 Hz
60 Hz
11' 000
13' 200
RPM
6' 300
7' 600
RPM
5-speed gear box :
3' 000
3' 600
RPM
1' 400
1' 700
RPM
750
900
RPM
Sound pressure level CEN/TC 255 N
77
79 dB (A)
Flexible shaft connection
DIN 10 =M10
see A6
For flexible shaft types:
NA 7 DIN 10 / G22
see B2 B8
(see catalogue)
Vibration values ISO/DIS 8662-4
Toolholder type: Test plate:
Measured value: Excenter stage:
FH7
ø 50 x 10
< 2,5 m/s
2
13' 200 RPM
WI7 with 45°
ø 50 x 10
< 2,5 m/s
2
13' 200 RPM
WI7
ø 50 x 6
< 2,5 m/s
2
13' 200 RPM
WIG7
ø115 x 6
3,8 m/s
2
23' 000 RPM
Maintenance
• Store machine in a dry, clean place.
• Cooling air ports must be kept free of obstructions.
• Unplug before performing any maintenance work.
• Change gear grease every 12 months. (Your
SUHNER
Service
Centre can perform this work quickly and efficiently.)
• Check connecting cables regularly. Damaged cables must be
replaced under all circumstances.
• Repairs may only be performed by a qualified electrician
Accidents could otherwise occur for the operator.
• Complaints can only be accepted if the machine is returned
unopened.
2. Flexible shaft
See Fig. B
Machine elements:
B1 M10 threaded coupling
B5 Core
B2 DIN 10 casing coupler
B6 Driving pin
B3 Spring-loaded pin
B7 Spring-loaded pin
B4 Casing
B8 G22 casing coupler
Type:
NA7x1500 DIN10/G22, permissible operating speed 20'000 RPM
NA7x2000 DIN10/G22, permissible operating speed 25'000 RPM
Maintenance
• Store flexible shaft in a dry, clean place.
• If used daily: Re-grease once monthly. Remove core
B5
from
casing
B4
. Remove shaft grease. Lightly apply SUHNER shaft
grease to core
B5
. Order No. for 1 kg can : 904 832.
• New shafts or newly greased shafts require running-in.
• Clean casing coupler
B2 B8
before use. Worn casing couplers
lead to increased vibration and noise. The casing
B4
must then
be replaced (see spare parts list).
3
.
1
Set the operating speed
(Excenter switch)
See Fig. A
• Only change speed when machine is switched off.
A1
Wait until
gears are completely motionless. Unplug power supply.
• Ensure that the desired speed
A4
is permissible for the tool and
toolholder used.
1. Remove retention pin
A2
.
2. Turn excenter
A5
clockwise until it reaches the limit stop.
Release retention pin
A2
. All speeds must be visible in this
position.
3. Move excenter
A5
axially until the correct
4. operating speed
A4
is positioned in the speed indicator
A3.
5. Turn excenter
A5
all the way to the left.
6. Retention pin
A2
must
click
audibly into place.
7. Ensure that the correct operating speed is positioned directly
and centrally in the speed indicator
A3
. If the retention pin does
not click into place, or the selected speed is not displayed in
the center, the procedure must be repeated from Step 1 .
• Attention : In case the machine is operated in one gear position
only - one must at least once a week switch through all
positions for a brief period in order to redistribute the grease
for long gear service life.
(run without flex.Shaft and handpiece)
3
.
2
Connect the flexible shaft
to the motor
See Figs. A + B
1. Insert pin in retention hole.
2. Slightly withdraw threaded coupling
B1
from casing coupler
B2
.
3. Insert second pin through transverse hole in threaded coupling
B1
and
4. Fasten tightly onto the motor shaft
A6
.
5. Remove pins.
6. Insert casing coupler
B2
completely into excenter hole
A5
.
7. Depress spring-loaded pin
B3
and completely insert casing
coupler
B2
.
8. Spring-loaded pin
B3
must
click
audibly into place in the
retention hole. Ensure that spring-loaded pin
B3
has locked
firmly into place. If necessary, move/rotate casing coupler
B2
until spring-loaded pin
B3
clicks into place.
3
.
3
Connect toolholders
( accessory )
See Fig. C
1. Insert casing coupler
B8
into tool connection.
2. Depress spring-loaded pin
B7
and completely insert casing
coupler
B8
.
3. Spring-loaded pin
B7
must
click
audibly into place in retention
hole
C1
. Ensure that spring-loaded pin
B7
has locked firmly
into place. If necessary, move/rotate casing coupler
B8
until
spring-loaded pin
B7
clicks into place.
Note: Toolholders WI7 with 45°, WI7 and WIG7 can be rotated
on the casing coupler for easier handling.
3
.
4
Start-up
• Attention : The powerfull machine develops a heavy torque
when switched-on. Thus secure yourself in a rigid
position and hold on to the handpiece.
• Switch on drive motor
A1
.