3. Disconnect the sample inlet, bypass, and waste outlet tubing from the Sensor.
4. Select the
Maintenance
menu.
5. Select
Diagnostics
.
6. Select
Pump
.
7. Turn the pump on and let it run for 10 minutes.
8. Stop the pump.
9. Power off the Sensor by pressing the
button.
10. Then, turn off the breaker, unplug the power cord, or remove the battery.
N
OTE
: You must remove the battery before shipping the Sensor.
11. Disconnect any wiring or cables connected to the I/O ports, including an Ethernet cable or
4-20 mA wiring (if applicable).
12. If the Sensor is mounted to a wall bracket, remove it from the bracket by gently but firmly pushing
up on the Sensor until it comes free of the bracket.
13. The Sensor is now ready to be packaged in the original shipping materials.