MAINTENANCE
17.1
General
For a good, safe and long-time operation of the boiler it is advised to carry out maintenance and service on the boiler.
Maintenance and inspection of the boiler should be carried out at the following occasions:
•
When several similar error codes and/or lock-outs appear.
•
At least every 12
months’ maintenance must be done to ensure safe and efficient operation.
Damage caused by lack of maintenance will not be covered under warranty
MAINTENANCE REMINDER FUNCTION.
See previous page
.
BE AWARE: This function is standard turned off. We offer this programmable function to the installer to use as a
reminder. Because it concerns a free programmable function the use of it cannot be used as an argument in warranty
cases. Our units must be maintained every 12 months whatever the settings/working of this function.
It is and remains the responsibly of the end user to have the unit maintained every twelve months.
For more information about this maintenance mode see chapter 10.14,
‘Setting the maintenance specifications’.
Service intervals
The normal service frequency for the boiler is once a year. Every year the boiler should be cleaned and checked,
according to the maintenance procedures. If there is doubt whether the boiler is operating with the correct water
and/or combustion air quality, it is advised that a first check is executed after already half a year. This check serves
to determine the frequency of the future services. The maximum interval between two services is a year.
INSPECTION AND MAINTENANCE MUST BE EXECUTED FOR A SAFE AND EFFICIENT OPERATION
OF THE BOILER.
17.2
Inspection & maintenance
At least every twelve
months’ maintenance must be done to ensure safe and efficient operation.
Inspection, maintenance and the replacement of boiler parts should only be done by a skilled service engineer. Apart
from the maintenance proceedings it is advised to have a log chart for every boiler that describes the following
aspects:
•
Serial number.
•
Date and time of maintenance.
•
Name of maintenance engineer.
•
Which parts were exchanged during maintenance.
•
Which settings (software) were changed during maintenance.
•
Special remarks / findings.
•
Future aspects that need extra attention.
•
Additional aspects: measurement reports, complaints by the (end)-user, lock-out codes, etc.
During maintenance the following parts and aspects of the boiler should be checked and inspected.
NOTICE: Before starting to work on the boiler:
•
Switch off the electrical power to the boiler (service switch and/or unplug boiler).
•
Close the gas valve to block gas supply to the boiler.
Customer comments
Comments and remarks from the customer should be analysed and used to find possible causes for any occurring
problems and complaints.