59
HEATING PROGRAM
Three programmed periods each day can be set (period 1, period 2 and period 3). During these periods, the unit will
use the normal CH and DHW set points. Outside the programmed period(s) the unit will use the reduced temperature
as set point. When there is no time programmed for a period, it will not be used.
(Example no time programmed in period 3 on Monday >
"Mon 3 --:-- ---:--"
).
Operating screen:
H E A T I N G : b o i l e r o f f
> > > : 1 2 3 . 4 ° C ( 1 2 3 . 4 ° C )
Press [MENU]
Select "Timer" using [◄] & [►] and press [ENTER]
Main menu screen:
M a i n M e n u
T i m e r
Press [ENTER]
Setting CH program times:
P r o g r a m C H
M o n 1
0 6 : 0 0
- 2 3 : 0 0
Press [►] to browse through the values that can be set at the bottom
line. The blinking value can be changed.
Press [▲] & [▼] to change the selected (blinking) value.
Press [ENTER] for confirmation screen when all settings are done.
Confirmation screen:
A r e y o u s u r e
<
C a n c e l ; > C o n f i r m
Press [
◄
] to cancel the changes made (unit will reset).
Press [
►
] to confirm the changes. The last alternation will be
blinking for a few seconds and return to base menu.
Press [MENU] to exit. The boiler will reset and go to the operating screen.
Press [
◄
] for next SCREEN
Copy programmed day for CH:
C o p y
f
r o m :
C H
M o n
C o p y
t o :
C H
T u e
Press [►] to switch between "Copy from" and "Copy to". The blinking
day is selected and can be changed.
Press [
▲] & [▼
] to change the selected (blinking) value.
Press [ENTER] for confirmation screen when all settings are done.
Confirmation screen:
A r e y o u s u r e
<
C a n c e l ; > C o n f i r m
Press [
◄
] to cancel the changes made (unit will reset).
Press [
►
] to confirm the changes. The two days will blink for a
moment.
Press [MENU] to exit. The boiler will reset and go to the operating screen.
Press [
◄
] for next SCREEN
> > > Continue on next page HOT WATER program < < <